Quick answers
What is this project?
42KTA of Propylene Recovery Unit (PRU) at Haldia Refinery by IOCL is a lapsed industrial project in Paramananda Chak, Haldia, Purba Medinipur, West Bengal. The site covers 11.8 acres.
Who is building it?
The applicant is Indian Oil Corporation Limited (IOCL).
Has it been approved?
No. The application was lapsed on 5 Jul 2026, so it is no longer under consideration.
Where is it?
In Paramananda Chak, Haldia, Purba Medinipur, West Bengal.
How big is it?
It has a site of 11.8 acres.
When was it filed?
The application was filed on 3 Jun 2026.
Project details
| Official title | Installation of 42KTA of Propylene Recovery Unit (PRU) at Haldia Refinery |
|---|---|
| Status | Lapsed |
| Status since | 5 Jul 2026 |
| Application filed | 3 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 11.8 acres (4.8 ha) |
| Village / locality | Paramananda Chak |
| Taluk / tehsil | Haldia |
| District | Purba Medinipur |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01695 |
In context
27 applications in Purba Medinipur since January 2022 are in the same category (Industry): 12 approved, 11 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 11.8 acres, this one is smaller than 78% of them.
32 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Paramananda Chak, Haldia, Purba Medinipur, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 2nd Catalytic Iso Dewaxing unit of capacity 270 TMTPA (Thousand Metric Ton Per… — returned to applicant, 200 m away
- 2nd Catalytic Iso Dewaxing unit of capacity 270 TMTPA (Thousand Metric Ton Per… — returned to applicant, 200 m away
- 30 KTA De-aromatized Specialty Products (DAS) Unit at Haldia Refinery by IOCL — more information requested, 350 m away
- EC amendment for Installation of 270 TMTPA capacity 2nd Catalytic Iso Dewaxing… — returned to applicant, 600 m away
- Proposed H2so4 Pipeline From Iocl Haldia Refinery To Finger Jetty Of Haldia… — coastal clearance granted, 650 m away
- Proposed Project for Laying of 2.5 Km 14" Lobs Dispatch Header From Haldia… — under coastal review, 900 m away
- Proposed Project for Laying of New Pipelines From New Oil Jetty, Outer… — coastal clearance granted, 1.5 km away
- A) Laying of Phenol Pipeline from HPL plant facility to Finger Jetty. B)… — coastal clearance granted, 2 km away
More from Indian Oil Corporation Limited (IOCL) in Purba Medinipur
- Proposed Project for Laying of 2.5 Km 14" Lobs Dispatch Header From Haldia… — under coastal review
- 30 KTA De-aromatized Specialty Products (DAS) Unit at Haldia Refinery by IOCL — more information requested
- EC amendment for Installation of 270 TMTPA capacity 2nd Catalytic Iso Dewaxing… — returned to applicant
- 2nd Catalytic Iso Dewaxing unit of capacity 270 TMTPA (Thousand Metric Ton Per… — returned to applicant
- 2nd Catalytic Iso Dewaxing unit of capacity 270 TMTPA (Thousand Metric Ton Per… — returned to applicant
7 Indian Oil Corporation (IOCL) projects in Purba Medinipur
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.