Quick answers
What is Bisinda Black Stone Project?
Bisinda Black Stone Project is a proposed mining project in Bishinda, Gangajalghati, Bankura, West Bengal. The site covers 2.7 acres.
Who is building it?
The applicant is Asraful Islam Khan.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Bishinda, Gangajalghati, Bankura, West Bengal.
How big is it?
It has a stated cost of ₹38 lakh and a site of 2.7 acres.
When was it filed?
The application was filed on 22 Sept 2025.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 13 Nov 2026 |
| Application filed | 22 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Asraful Islam Khan |
| Land area | 2.7 acres (1.1 ha) |
| Project cost | ₹38 lakh |
| Village / locality | Bishinda |
| Taluk / tehsil | Gangajalghati |
| District | Bankura |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01114 |
In context
216 applications in Bankura since January 2022 are in the same category (Mining): 146 approved, 54 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.7 acres, this one is smaller than 99% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Bishinda, Gangajalghati, Bankura, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Green Harvest Fruit Garden — initial checks, 2.6 km away
- Expansion in Steel Plant for Increasing Capacity of Sms Unit From 180805 Tpa… — cleared for impact study, 5.6 km away
- Environmental Clearance for the expansion of existing secondary metallurgical… — initial checks, 5.6 km away
- Environmental Clearance for the expansion of existing secondary metallurgical… — under environmental review, 5.6 km away
- The proposed expansion proposal containing additional installing of 2 X20 MT… — environmental approval granted, 5.6 km away
- Expansion of Existing Secondary Metallurgical Unit (For Production of MS Ingot… — cleared for impact study, 5.6 km away
- Environmental Clearance for the expansion of existing secondary metallurgical… — not approved, 5.6 km away
- Diversion of 220KV MTPS-Barjora line from MTPS-A to MTPS-B and connectivity… — forest land use approved, 5.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.