One of 2 filings for this project. The project's main page, with every filing and where each stands: Integrated Steel Plant (1.0 MTPA)
Project details
| Official title | Integrated Steel Plant (1.0 MTPA) along with Coal Based Power Plant (200 MW) |
|---|---|
| Status | Initial checks |
| Status since | 18 Sept 2025 |
| Application filed | 18 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Power |
| Applicant | Orissa Steel & Power PVT. LTD. |
| Land area | 515 acres (208.4 ha) |
| Project cost | ₹2,336 crore |
| Village / locality | Meral |
| Taluk / tehsil | Jamuria |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01138 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Sept 2025 (this page) | Initial checks | 515 acres | ₹2,336 crore |
| Validity extension filed 17 Jul 2025 | Environmental approval granted | 515 acres | ₹2,336 crore |
In context
8 applications in Paschim Bardhaman since January 2022 are in the same category (Power): 2 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected.
66 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Meral, Jamuria, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Integrated Steel Plant (1.0 MTPA) — environmental approval granted, 0 m away
- Integrated Steel Plant (1 MTPA) — withdrawn, 0 m away
- Proposed expansion of Integrated Steel Plant (1.0 MTPA) — under environmental review, 150 m away
- Expansion in Existing Sponge Iron Plant (2 x 100 TPD) by addition of 350 TPD… — environmental approval granted, 1.2 km away
- Expansion in Existing Sponge Iron Plant (2 x 100 TPD) by addition of 350 TPD… — under environmental review, 1.2 km away
- Proposed expansion of existing Steel Plant by installation of Sponge Iron… — returned to applicant, 1.9 km away
- Proposed expansion of existing Steel Plant by installation of Sponge Iron… — lapsed, 1.9 km away
- Proposed expansion of existing Steel Plant by installation of Sponge Iron… — under environmental review, 1.9 km away
4 Orissa Steel & Power projects in Paschim Bardhaman
All 5 Orissa Steel & Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.