Project details
| Official title | Proposed expansion of Integrated Steel Plant (1.0 MTPA) along with Coal Based Power Plant (200 MW) to Integrated Steel Plant (8.0 MTPA) along with Captive Power Plant (1119 MW) |
|---|---|
| Status | Under environmental review |
| Status since | 24 Aug 2026 |
| Application filed | 21 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Orissa Steel & Power Private Limited |
| Land area | 630 acres (255 ha) |
| Project cost | ₹10,336 crore |
| Village / locality | Dhasna |
| Taluk / tehsil | Jamuria |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01817 |
In context
169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 630 acres, this one is larger than 93% of them.
67 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhasna, Jamuria, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Integrated Steel Plant (1.0 MTPA) — initial checks, 150 m away
- Integrated Steel Plant (1.0 MTPA) — environmental approval granted, 150 m away
- Integrated Steel Plant (1 MTPA) — withdrawn, 150 m away
- Expansion in Existing Sponge Iron Plant (2 x 100 TPD) by addition of 350 TPD… — environmental approval granted, 1.1 km away
- Expansion in Existing Sponge Iron Plant (2 x 100 TPD) by addition of 350 TPD… — under environmental review, 1.1 km away
- Proposed expansion of existing Steel Plant by installation of Sponge Iron… — returned to applicant, 1.8 km away
- Proposed expansion of existing Steel Plant by installation of Sponge Iron… — lapsed, 1.8 km away
- Proposed expansion of existing Steel Plant by installation of Sponge Iron… — under environmental review, 1.8 km away
More from Orissa Steel & Power Private Limited in Paschim Bardhaman
- Integrated Steel Plant (1 MTPA) — withdrawn
4 Orissa Steel & Power projects in Paschim Bardhaman
All 5 Orissa Steel & Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.