One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed an Integrated Steel Plant of 3.1 Million Ton per annum (Finished Steel)
Project details
| Official title | Proposed an Integrated Steel Plant of 3.1 Million Ton per annum (Finished Steel) along with 230MW (80MW WHRB/TRT based +150 MW coal based) Captive Power Plant |
|---|---|
| Status | Initial checks |
| Status since | 17 Mar 2025 |
| Application filed | 17 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Power |
| Applicant | Rashmi Green Hydrogen Steel Private Limited |
| Land area | 277 acres (112.1 ha) |
| Project cost | ₹2,900 crore |
| Village / locality | Changuyal |
| Taluk / tehsil | Kharagpur - Ii |
| District | Medinipur West |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01440 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Mar 2025 (this page) | Initial checks | 277 acres | ₹2,900 crore |
| New project filed 17 Jan 2023 | Environmental approval granted | 531.2 acres | ₹2,900 crore |
In context
11 applications in Medinipur West since January 2022 are in the same category (Power): 2 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. At 277 acres, this one is smaller than 55% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Changuyal, Kharagpur - Ii, Medinipur West, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed an Integrated Steel Plant of 3.1 Million Ton per annum (Finished Steel) — environmental approval granted, 0 m away
- Industrial project by M/s Svaksha Distillery Limited — initial checks, 4.5 km away
- Expansion of Distillery Plant by addition of 225 KLD… — under environmental review, 4.5 km away
- Expansion of Distillery Plant with addition of 225 KLD Grain Based ethanol… — withdrawn, 4.5 km away
- Integrated Steel Plant of capacity 0.9 Million Ton per Annum (Finished Steel) — initial checks, 4.6 km away
- Amendment in Environmental Clearance vide File no. EN/T-II-1/167/2021 dated… — environmental approval granted, 5.4 km away
- Kharagpur Cement Grinding Unit with capacity of 2x 3.0 MMTPA" — cleared for impact study, 6 km away
- Integrated Steel Plant of capacity 0.9 Million Ton per Annum (Finished Steel) — environmental approval granted, 6.7 km away
About this information