One of 2 filings for this project. The project's main page, with every filing and where each stands: Integrated Steel Plant of capacity 0.9 Million Ton per Annum (Finished Steel)
Project details
| Official title | Integrated Steel Plant of capacity 0.9 Million Ton per Annum (Finished Steel) along with 137 MW (92 MW WHRB based & 45 MW Coal and Dolochar mix based) Captive Power Plant |
|---|---|
| Status | Initial checks |
| Status since | 15 Oct 2026 |
| Application filed | 15 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Power |
| Applicant | Orissa Alloy Steel PVT. LTD. |
| Land area | 253 acres (102.4 ha) |
| Project cost | ₹1,300 crore |
| Village / locality | Baradiha |
| Taluk / tehsil | Kharagpur - Ii |
| District | Medinipur West |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01750 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 15 Oct 2026 (this page) | Initial checks | 253 acres | ₹1,300 crore |
| New project filed 7 Jul 2023 | Environmental approval granted | 653 acres | ₹1,300 crore |
In context
11 applications in Medinipur West since January 2022 are in the same category (Power): 2 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. At 253 acres, this one is smaller than 64% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baradiha, Kharagpur - Ii, Medinipur West, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment in Environmental Clearance vide File no. EN/T-II-1/167/2021 dated… — environmental approval granted, 2.2 km away
- Proposed an Integrated Steel Plant of 3.1 Million Ton per annum (Finished Steel) — initial checks, 4.6 km away
- Proposed an Integrated Steel Plant of 3.1 Million Ton per annum (Finished Steel) — environmental approval granted, 4.6 km away
- Integrated Steel Plant of capacity 0.9 Million Ton per Annum (Finished Steel) — environmental approval granted, 6.5 km away
- Assessment of No Increase in Pollution Load for Enhancement of Coke Oven Plant… — initial checks, 7.1 km away
- Assessment of No Increase in Pollution Load for Product Mix in Beneficiation… — initial checks, 7.3 km away
- Assessment of No Increase in Pollution Load for product mix (Titanium Slag @… — initial checks, 7.3 km away
- Expansion of Integrated Steel Plant; Mbf –(5,00,000 Tpa to 5,50,000 Tpa) &… — environmental approval granted, 8.3 km away
More from Orissa Alloy Steel PVT. LTD. in Medinipur West
- Assessment of No Increase in Pollution Load for Product Mix in Beneficiation… — initial checks
- Assessment of No Increase in Pollution Load for Enhancement of Coke Oven Plant… — initial checks
- Assessment of No Increase in Pollution Load for product mix (Titanium Slag @… — initial checks
5 Orissa Alloy Steel projects in Medinipur West
All 12 Orissa Alloy Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.