Project details
| Official title | Integrated Steel Plant of capacity 0.9 Million Ton per Annum (Finished Steel) along with 137 MW (92 MW WHRB based & 45 MW Coal and Dolochar mix based) Captive Power Plant |
|---|---|
| Status | Environmental approval granted |
| Status since | 12 Oct 2023 |
| Application filed | 7 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Orissa Alloy Steel PVT. LTD. |
| Land area | 653 acres (264.2 ha) |
| Project cost | ₹1,300 crore |
| Village / locality | Baradiha |
| Taluk / tehsil | Kharagpur - Ii |
| District | Medinipur West |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00045 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 15 Oct 2026 | Initial checks | 253 acres | ₹1,300 crore |
| New project filed 7 Jul 2023 (this page) | Environmental approval granted | 653 acres | ₹1,300 crore |
In context
43 applications in Medinipur West since January 2022 are in the same category (Industry): 27 approved, 10 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 653 acres, this one is larger than 95% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baradiha, Kharagpur - Ii, Medinipur West, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Assessment of No Increase in Pollution Load for Enhancement of Coke Oven Plant… — initial checks, 4.6 km away
- Amendment in Environmental Clearance vide File no. EN/T-II-1/167/2021 dated… — environmental approval granted, 4.7 km away
- Assessment of No Increase in Pollution Load for Product Mix in Beneficiation… — initial checks, 5.3 km away
- Assessment of No Increase in Pollution Load for product mix (Titanium Slag @… — initial checks, 5.4 km away
- Expansion of Integrated Steel Plant; Mbf –(5,00,000 Tpa to 5,50,000 Tpa) &… — environmental approval granted, 5.6 km away
- Expansion of Integrated Steel Plant; Mbf –(5,00,000 Tpa to 5,50,000 Tpa) &… — cleared for impact study, 5.6 km away
- Proposed Expansion-cum-Modification of existing steel plant at Industrial… — withdrawn, 6.3 km away
- Expansion of Integrated Steel Plant from 2.0 million TPA with 385 MW CPP to… — initial checks, 6.3 km away
More from Orissa Alloy Steel PVT. LTD. in Medinipur West
- Assessment of No Increase in Pollution Load for Product Mix in Beneficiation… — initial checks
- Assessment of No Increase in Pollution Load for Enhancement of Coke Oven Plant… — initial checks
- Assessment of No Increase in Pollution Load for product mix (Titanium Slag @… — initial checks
5 Orissa Alloy Steel projects in Medinipur West
All 12 Orissa Alloy Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.