What is Developing? Open the mapMap

Under environmental reviewIndustry · Puruliya, West Bengal

Greenfield Integrated Steel Plant for production of 2.73 MTPA Crude Steel, 0.54 MTPA (Max) Ferro Alloys Plant, 2 MTPA Cement Plant and 484 MW Captive Power Plant by Shakambhari Ispat & Power Limited

Greenfield Integrated Steel Plant for production of 2.73 MTPA Crude Steel, 0.54 MTPA (Max) Ferro Alloys Plant, 2 MTPA Cement Plant and 484 MW Captive Power Plant by Shakambhari Ispat & Power Limited is a proposed industrial project in Nildi, Raghunathpur - Ii, Puruliya, West Bengal. The site covers 4,486.1 acres. Its stated project cost is ₹10,000 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 7 Sept 2026).

See it on the live map All projects in Puruliya

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Greenfield Integrated Steel Plant for production of 2.73 MTPA Crude Steel, 0.54 MTPA (Max) Ferro Alloys Plant, 2 MTPA Cement Plant and 484 MW Captive Power Plant by Shakambhari Ispat & Power Limited is a proposed industrial project in Nildi, Raghunathpur - Ii, Puruliya, West Bengal. The site covers 4,486.1 acres.

Who is building it?

The applicant is Shakambhari Ispat & Power Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Nildi, Raghunathpur - Ii, Puruliya, West Bengal.

How big is it?

It has a stated cost of ₹10,000 crore and a site of 4,486.1 acres.

When was it filed?

The application was filed on 16 Jul 2026.

Project details

Official titleEstablishment of Greenfield Integrated Steel Plant for production of 2.73 MTPA Crude Steel, 0.54 MTPA (Max) Ferro Alloys Plant, 2 MTPA Cement Plant and 484 MW Captive Power Plant along with allied facilities located at Village: Hurra & Durmut, P.O.: Raghunathpur, District: Purulia, West Bengal by Shakambhari Ispat & Power Limited
StatusUnder environmental review
Status since7 Sept 2026
Application filed16 Jul 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantShakambhari Ispat & Power Limited
Land area4,486.1 acres (1,815.5 ha)
Project cost₹10,000 crore
Village / localityNildi
Taluk / tehsilRaghunathpur - Ii
DistrictPuruliya
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-01623

In context

33 applications in Puruliya since January 2022 are in the same category (Industry): 22 approved, 5 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4,486.1 acres, this one is larger than 97% of them.

Where it is

Nildi, Raghunathpur - Ii, Puruliya, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Shakambhari Ispat & Power Limited in Puruliya

All 9 Shakambhari Ispat & Power projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.