Greenfield Integrated Steel Plant for production of 2.73 MTPA Crude Steel, 0.54 MTPA (Max) Ferro Alloys Plant, 2 MTPA Cement Plant and 484 MW Captive Power Plant by Shakambhari Ispat & Power Limited is a proposed industrial project in Nildi, Raghunathpur - Ii, Puruliya, West Bengal. The site covers 4,486.1 acres.
Who is building it?
The applicant is Shakambhari Ispat & Power Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Nildi, Raghunathpur - Ii, Puruliya, West Bengal.
How big is it?
It has a stated cost of ₹10,000 crore and a site of 4,486.1 acres.
When was it filed?
The application was filed on 16 Jul 2026.
Project details
| Official title | Establishment of Greenfield Integrated Steel Plant for production of 2.73 MTPA Crude Steel, 0.54 MTPA (Max) Ferro Alloys Plant, 2 MTPA Cement Plant and 484 MW Captive Power Plant along with allied facilities located at Village: Hurra & Durmut, P.O.: Raghunathpur, District: Purulia, West Bengal by Shakambhari Ispat & Power Limited |
|---|---|
| Status | Under environmental review |
| Status since | 7 Sept 2026 |
| Application filed | 16 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Shakambhari Ispat & Power Limited |
| Land area | 4,486.1 acres (1,815.5 ha) |
| Project cost | ₹10,000 crore |
| Village / locality | Nildi |
| Taluk / tehsil | Raghunathpur - Ii |
| District | Puruliya |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01623 |
In context
33 applications in Puruliya since January 2022 are in the same category (Industry): 22 approved, 5 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4,486.1 acres, this one is larger than 97% of them.
Where it is
Nildi, Raghunathpur - Ii, Puruliya, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Puncha Sand Mine (MIN_PUR_7) — environmental approval granted, 10.1 km away
- Puncha Sand Mine (MIN_PUR_21) — environmental approval granted, 10.4 km away
- R.C.C. Bridge over Kansai River — lapsed, 10.7 km away
- Petrol Pump at Gurda Under P.O Laxmanpur With District-Purulia — not approved, 12.4 km away
- Liya Quartz Mine — lapsed, 14.8 km away
- Metayala Quartz Mine — lapsed, 15.7 km away
- Revitalisation of Babuijore Government Owned (Defunct) Major Rli Scheme — lapsed, 18.4 km away
- Revitalisation of Babuijore Government Owned (Defunct) Major Rli Scheme — lapsed, 18.4 km away
More from Shakambhari Ispat & Power Limited in Puruliya
- Application of "No Increase in Pollution Load" Certificate for Change in… — initial checks
- Application for "No Increase in Pollution Load" Certificate for Change in Raw… — initial checks
- Application of "No Increase in Pollution Load" Certificate for Change in… — initial checks
- Transfer of Environment Clearance due to change in Change in CIN & GSTIN… — environmental approval granted
- Transfer of Environment Clearance from Bravo Sponge Iron Private Limited to… — environmental approval granted
- Expansion of Sponge Iron Plant for Production of 2.1555 Million Tons Per Annum… — environmental approval granted
All 9 Shakambhari Ispat & Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.