What is Developing? Open the mapMap

Initial checksBuildings & townships · Puruliya, West Bengal

Application of "No Increase in Pollution Load" Certificate for Change in Configuration in Induction Furnaces from 3x25T to 1x25, 1x20, 2x15T without any change in sanctioned production capacity" by M/s. Shakambhari Ispat & Power Limited

Application of "No Increase in Pollution Load" Certificate for Change in Configuration in Induction Furnaces from 3x25T to 1x25, 1x20, 2x15T without any change in sanctioned production capacity" by M/s. Shakambhari Ispat & Power Limited is a proposed industrial building project in Mahuda, Para, Puruliya, West Bengal. The site covers 382.3 acres. Its stated project cost is ₹5,650 crore. As of 27 Nov 2026, its status is “Initial checks” (since 23 Mar 2026).

See it on the live map All projects in Puruliya

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Application of "No Increase in Pollution Load" Certificate for Change in Configuration in Induction Furnaces from 3x25T to 1x25, 1x20, 2x15T without any change in sanctioned production capacity" by M/s. Shakambhari Ispat & Power Limited is a proposed industrial building project in Mahuda, Para, Puruliya, West Bengal. The site covers 382.3 acres.

Who is building it?

The applicant is Shakambhari Ispat & Power Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Mahuda, Para, Puruliya, West Bengal.

How big is it?

It has a stated cost of ₹5,650 crore and a site of 382.3 acres.

When was it filed?

The application was filed on 23 Mar 2026.

Project details

Official titleApplication of "No Increase in Pollution Load" Certificate for Change in Configuration in Induction Furnaces from 3x25T to 1x25, 1x20, 2x15T without any change in sanctioned production capacity" by M/s. Shakambhari Ispat & Power Limited at Village- Mahuda, P.O.- Rukni, District- Purulia, West Bengal
StatusInitial checks
Status since23 Mar 2026
Application filed23 Mar 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantShakambhari Ispat & Power Limited
UseIndustrial
Land area382.3 acres (154.7 ha)
Plot area15,47,300 m² (1,66,54,982 sq ft)
Project cost₹5,650 crore
Village / localityMahuda
Taluk / tehsilPara
DistrictPuruliya
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-01884

In context

5 applications in Puruliya since January 2022 are in the same category (Buildings & townships): 0 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected.

7 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mahuda, Para, Puruliya, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Shakambhari Ispat & Power Limited in Puruliya

All 9 Shakambhari Ispat & Power projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.