Quick answers
What is this project?
Application of "No Increase in Pollution Load" Certificate for Change in Configuration in Induction Furnaces from 3x25T to 1x25, 1x20, 2x15T without any change in sanctioned production capacity" by M/s. Shakambhari Ispat & Power Limited is a proposed industrial building project in Mahuda, Para, Puruliya, West Bengal. The site covers 382.3 acres.
Who is building it?
The applicant is Shakambhari Ispat & Power Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Mahuda, Para, Puruliya, West Bengal.
How big is it?
It has a stated cost of ₹5,650 crore and a site of 382.3 acres.
When was it filed?
The application was filed on 23 Mar 2026.
Project details
| Official title | Application of "No Increase in Pollution Load" Certificate for Change in Configuration in Induction Furnaces from 3x25T to 1x25, 1x20, 2x15T without any change in sanctioned production capacity" by M/s. Shakambhari Ispat & Power Limited at Village- Mahuda, P.O.- Rukni, District- Purulia, West Bengal |
|---|---|
| Status | Initial checks |
| Status since | 23 Mar 2026 |
| Application filed | 23 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Shakambhari Ispat & Power Limited |
| Use | Industrial |
| Land area | 382.3 acres (154.7 ha) |
| Plot area | 15,47,300 m² (1,66,54,982 sq ft) |
| Project cost | ₹5,650 crore |
| Village / locality | Mahuda |
| Taluk / tehsil | Para |
| District | Puruliya |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01884 |
In context
5 applications in Puruliya since January 2022 are in the same category (Buildings & townships): 0 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mahuda, Para, Puruliya, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application for "No Increase in Pollution Load" Certificate for Change in Raw… — initial checks, 0 m away
- Transfer of Environment Clearance from Bravo Sponge Iron Private Limited to… — environmental approval granted, 0 m away
- Transfer of Environment Clearance from Bravo Sponge Iron Private Limited to… — withdrawn, 0 m away
- Application of "No Increase in Pollution Load" Certificate for Change in… — initial checks, 0 m away
- Expansion of Sponge Iron Plant for Production of 2.1555 Million Tons Per Annum… — environmental approval granted, 0 m away
- Dumurdih Black Stone Mine — initial checks, 4.8 km away
- Dumurdih Black Stone Mine — environmental approval granted, 4.8 km away
- Birkicha Black Stone Mine — not approved, 7.5 km away
More from Shakambhari Ispat & Power Limited in Puruliya
- Application of "No Increase in Pollution Load" Certificate for Change in… — initial checks
- Greenfield Integrated Steel Plant for production of 2.73 MTPA Crude Steel,… — under environmental review
- Application for "No Increase in Pollution Load" Certificate for Change in Raw… — initial checks
- Transfer of Environment Clearance due to change in Change in CIN & GSTIN… — environmental approval granted
- Transfer of Environment Clearance from Bravo Sponge Iron Private Limited to… — environmental approval granted
- Expansion of Sponge Iron Plant for Production of 2.1555 Million Tons Per Annum… — environmental approval granted
All 9 Shakambhari Ispat & Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.