Project details
| Official title | Expansion of Sponge Iron Plant to Increase the Production Capacity From 1,15,500 Tpa to 2,31,000 Tpa by Adding an Additional 350 Tpd Dri Kiln Alongwith the Existing 350 Tpd Dri Kiln, Whrb Based Captive Power Plant From 8 MW to 16 MW, Ferro Alloy Plant for Production of Silico Manganese From 16,929 Tpa to 33858 Tpa Or Ferro Manganese From 21,092 Tpa to 42184 Tpa Or Ferro Silicon From 9,191 Tpa to 18382 Tpa by Adding an Additional 9 Mva#saf Along With the Existing 9 Mva#saf |
|---|---|
| Status | Lapsed |
| Status since | 5 Sept 2026 |
| Application filed | 12 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Satyam Iron & Steel Co Private Limited |
| Land area | 17.4 acres (7.1 ha) |
| Project cost | ₹340 crore |
| Village / locality | Mandalpur |
| Taluk / tehsil | Jamuria |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01665 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 12 Jan 2026 (this page) | Lapsed | 17.4 acres | ₹340 crore |
| Early planning filed 2 May 2025 | Cleared for impact study | 17.4 acres | ₹340 crore |
In context
169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 17.4 acres, this one is smaller than 72% of them.
67 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mandalpur, Jamuria, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Sponge Iron Plant to Increase the Production Capacity From… — cleared for impact study, 0 m away
- Greenfield Project for Production of Sponge Iron 1,15,500 TPA with 350 TPD DRI… — environmental approval granted, 0 m away
- Expansion of Dual Re-Rolling MillPlant located at Plot No. 2966, 2968&… — lapsed, 350 m away
- Proposed ISP: Iron Ore Beneficiation Plant (2.8 MTPA), Pelletization Plant (2… — environmental approval granted, 600 m away
- Proposed ISP: Iron Ore Beneficiation Plant (2.8 MTPA), Pelletization Plant (2… — cleared for impact study, 600 m away
- Re-Rolling Mill Steel Plant located at R.S. & L.R. Plot No. 2849, 2861,… — not approved, 650 m away
- Re-Rolling Mill Steel Plant located at R.S. & L.R. Plot No. 2849, 2861,… — more information requested, 650 m away
- Environmental Clearance for Expansion of production capacity from 1,08,000 TPA… — environmental approval granted, 750 m away
More from Satyam Iron & Steel Co Private Limited in Paschim Bardhaman
- Expansion Under 7(Ii)(A) in the Existing Steel Plant by Increasing the… — returned to applicant
- Greenfield Project for Production of Sponge Iron 1,15,500 TPA with 350 TPD DRI… — environmental approval granted
All 8 Satyam Iron and Steel Co projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.