LapsedIndustry · Paschim Bardhaman, West Bengal

Expansion of Sponge Iron Plant to Increase the Production Capacity From 1,15,500 Tpa to 2,31,000 Tpa by Adding an Additional 350 Tpd Dri Kiln Alongwith the Existing 350 Tpd Dri Kiln, Whrb Based Captive Power Plant From 8 MW to 16 MW, Ferro Alloy Plant for Production of Silico Manganese From 16,929 Tpa to 33858 Tpa Or Ferro Manganese From 21,092 Tpa to 42184 Tpa Or Ferro Silicon From 9,191 Tpa to 18382 Tpa by Adding an Additional 9 Mva#saf

Expansion of Sponge Iron Plant to Increase the Production Capacity From 1,15,500 Tpa to 2,31,000 Tpa by Adding an Additional 350 Tpd Dri Kiln Alongwith the Existing 350 Tpd Dri Kiln, Whrb Based Captive Power Plant From 8 MW to 16 MW, Ferro Alloy Plant for Production of Silico Manganese From 16,929 Tpa to 33858 Tpa Or Ferro Manganese From 21,092 Tpa to 42184 Tpa Or Ferro Silicon From 9,191 Tpa to 18382 Tpa by Adding an Additional 9 Mva#saf is a lapsed industrial project in Mandalpur, Jamuria, Paschim Bardhaman, West Bengal. The site covers 17.4 acres. Its stated project cost is ₹340 crore. As of 27 Nov 2026, its status is “Lapsed” (since 5 Sept 2026).

See it on the live map All projects in Paschim Bardhaman

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Sponge Iron Plant to Increase the Production Capacity From 1,15,500 Tpa to…

Project details

Official titleExpansion of Sponge Iron Plant to Increase the Production Capacity From 1,15,500 Tpa to 2,31,000 Tpa by Adding an Additional 350 Tpd Dri Kiln Alongwith the Existing 350 Tpd Dri Kiln, Whrb Based Captive Power Plant From 8 MW to 16 MW, Ferro Alloy Plant for Production of Silico Manganese From 16,929 Tpa to 33858 Tpa Or Ferro Manganese From 21,092 Tpa to 42184 Tpa Or Ferro Silicon From 9,191 Tpa to 18382 Tpa by Adding an Additional 9 Mva#saf Along With the Existing 9 Mva#saf
StatusLapsed
Status since5 Sept 2026
Application filed12 Jan 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantSatyam Iron & Steel Co Private Limited
Land area17.4 acres (7.1 ha)
Project cost₹340 crore
Village / localityMandalpur
Taluk / tehsilJamuria
DistrictPaschim Bardhaman
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-01665

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 12 Jan 2026 (this page)Lapsed17.4 acres₹340 crore
Early planning filed 2 May 2025Cleared for impact study17.4 acres₹340 crore

In context

169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 17.4 acres, this one is smaller than 72% of them.

67 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mandalpur, Jamuria, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Satyam Iron & Steel Co Private Limited in Paschim Bardhaman

All 8 Satyam Iron and Steel Co projects across India

About this information