Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Jun 2026 |
| Application filed | 8 May 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Eastern Coalfields LTD |
| Land area | 12,629.5 acres (5,111 ha) |
| Project cost | ₹709.6 crore |
| Village / locality | Bahula |
| Taluk / tehsil | Pandabeswar |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01700 |
In context
94 applications in Paschim Bardhaman since January 2022 are in the same category (Mining): 58 approved, 22 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 12,629.5 acres, this one is larger than 89% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Bahula, Pandabeswar, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Cluster no. 10 (Group of Mines) of M/s Eastern Coalfields Ltd. — returned to applicant, 0 m away
- Environment Clearance for Existing 62,400 TPA Hot Rolling Mill for production… — lapsed, 2.4 km away
- Environment Clearance for Existing 62,400 TPA Hot Rolling Mill for production… — cleared for impact study, 2.4 km away
- Expansion in Sponge Iron Production from 49,500 TPA to 1, 22,100 TPA by M/s… — environmental approval granted, 3 km away
- Proposed Expansion cum modification of Existing Steel Plant — returned to applicant, 3 km away
- Proposed Expansion cum modification of Existing Steel Plant — lapsed, 3 km away
- Expansion Under 7(Ii)(A) in the Existing Steel Plant by Increasing the… — returned to applicant, 3.1 km away
- Expansion In The Production Capacity Of Rolling Mill From 60,000 Tpa To 72,000… — environmental approval granted, 3.1 km away
More from Eastern Coalfields LTD in Paschim Bardhaman
- Girmint-Kd Incline Ug Coal Mine — under environmental review
- MOIRA UG COAL MINE (0.75 MTPA/ 455.69 Ha) — more information requested
- Ratibati Ug Coal Mine — more information requested
- Cluster no. 6 group of 7 UG mines, production capacity 1.25 MTY in ML area of… — lapsed
- Proposed Chinakuri Underground Coal Mine (Target Capacity: 1.0 MTPA, ML area… — lapsed
- Cluster No. 12 (Group of 14 Mines) — under environmental review
20 Eastern Coalfields projects in Paschim Bardhaman
All 28 Eastern Coalfields projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.