Project details
| Status | Lapsed |
|---|---|
| Status since | 19 Aug 2025 |
| Application filed | 6 Jun 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | West Bengal Public Health Engineering Directorate |
| Land area | 800 m² |
| Forest land | 790 m² |
| Project cost | ₹1.7 crore |
| Village / locality | Forest Mangpong |
| Taluk / tehsil | Kalimpong -I |
| District | Kalimpong |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02032 |
In context
75 applications in Kalimpong since January 2022 are in the same category (Water & irrigation): 9 approved, 41 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 19 months from filing to approval. At 0.2 acres, this one is larger than 67% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Forest Mangpong, Kalimpong -I, Kalimpong, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G saturation Project in uncovered village Mangpong Forest — forest land use approved, 300 m away
- Proposed 0.0970 Ha Land to Be Diverted Mongpong Forest (Part) Piped Water… — more information requested, 300 m away
- Additional Major Bridge and its approaches across river Teesta (at Sevoke)… — under wildlife review, 1 km away
- Chunabhatti Bazar D.I.F & Lish Forest Piped Water Supply Scheme — more information requested, 7 km away
- Diversion of forest land measuring 0.99 Ha for construction of SV-03 cum RT… — lapsed, 7.8 km away
- Diversion of forest land measuring 0.9743 Ha for construction of SV-03 cum RT… — lapsed, 7.8 km away
- 4G Saturation Project in uncovered village Lish Forest — forest land use approved, 8.1 km away
- PROPOSED 0.0360 Ha FOREST LAND TO BE DIVERTED FOR SURFACE WATER BASED… — more information requested, 12.3 km away
More from West Bengal Public Health Engineering Directorate in Kalimpong
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for… — lapsed
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for 1… — lapsed
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for… — lapsed
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for 16th… — lapsed
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for… — under wildlife review
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for 1… — under wildlife review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.