Project details
| Status | Forest land use approved |
|---|---|
| Status since | 14 May 2024 |
| Application filed | 29 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 100 m² |
| Forest land | 200 m² |
| Project cost | ₹1 crore |
| Village / locality | Lish Forest |
| Taluk / tehsil | Kalimpong -I |
| District | Kalimpong |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02283 |
In context
19 applications in Kalimpong since January 2022 are in the same category (Telecom): 8 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lish Forest, Kalimpong -I, Kalimpong, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- PROPOSED 0.0360 Ha FOREST LAND TO BE DIVERTED FOR SURFACE WATER BASED… — more information requested, 4.6 km away
- PROPOSED 0.0663 Ha FOREST LAND TO BE DIVERTED FOR SURFACE WATER BASED NIMBONG… — more information requested, 4.9 km away
- Proposed surface water based Nabgaon Khasmahal PWSS to accommodate FHTC — forest land use approved, 5 km away
- Chunabhatti Bazar D.I.F & Lish Forest Piped Water Supply Scheme — more information requested, 5.4 km away
- PWS Scheme — lapsed, 5.4 km away
- Diversion of forest land measuring 0.4050 Ha for construction of SV-03 & SV-05… — lapsed, 5.4 km away
- Diversion of forest land measuring 0.99 Ha for construction of SV-03 cum RT… — lapsed, 5.8 km away
- Diversion of forest land measuring 0.9743 Ha for construction of SV-03 cum RT… — lapsed, 5.8 km away
More from Mahesh Nair in Kalimpong
- 4G Saturation Project in Uncovered Village KITAPSI — more information requested
- 4G Saturation Project in Uncovered Village DALGAON — more information requested
- 4G Saturation Project in Uncovered Village Paren Forest — more information requested
- ADSS OFC Laying of 18.433 Km under 4G Saturation DBN Funded Project of GOI — more information requested
- 4G saturation Project in uncovered village Mangpong Forest — forest land use approved
- 4G Saturation Project — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.