Project details
| Status | Forest land use approved |
|---|---|
| Status since | 14 May 2024 |
| Application filed | 29 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 100 m² |
| Forest land | 200 m² |
| Project cost | ₹1 crore |
| Village / locality | Mangpong Forest |
| Taluk / tehsil | Kalimpong -I |
| District | Kalimpong |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02116 |
In context
19 applications in Kalimpong since January 2022 are in the same category (Telecom): 8 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mangpong Forest, Kalimpong -I, Kalimpong, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 0.0789 Ha Land to Be Acquired for Gravity Based and Pumping Pwss for… — lapsed, 300 m away
- Proposed 0.0970 Ha Land to Be Diverted Mongpong Forest (Part) Piped Water… — more information requested, 600 m away
- Additional Major Bridge and its approaches across river Teesta (at Sevoke)… — under wildlife review, 750 m away
- Chunabhatti Bazar D.I.F & Lish Forest Piped Water Supply Scheme — more information requested, 7 km away
- Diversion of forest land measuring 0.99 Ha for construction of SV-03 cum RT… — lapsed, 7.9 km away
- Diversion of forest land measuring 0.9743 Ha for construction of SV-03 cum RT… — lapsed, 7.9 km away
- 4G Saturation Project in uncovered village Lish Forest — forest land use approved, 8.4 km away
- PROPOSED 0.0360 Ha FOREST LAND TO BE DIVERTED FOR SURFACE WATER BASED… — more information requested, 12.6 km away
More from Mahesh Nair in Kalimpong
- 4G Saturation Project in Uncovered Village KITAPSI — more information requested
- 4G Saturation Project in Uncovered Village DALGAON — more information requested
- 4G Saturation Project in Uncovered Village Paren Forest — more information requested
- ADSS OFC Laying of 18.433 Km under 4G Saturation DBN Funded Project of GOI — more information requested
- 4G Saturation Project — forest land use approved
- 4G Saturation Project in uncovered village Lish Forest — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.