Quick answers
What is this project?
Surface Based Water Supply Scheme Northern Zone Under Purulia Division, Phe Dte is a lapsed water and irrigation project in Gar Panchkot, Neturia, Puruliya, West Bengal. It seeks 2.4 acres of forest land.
Who is building it?
The applicant is Supriya Chakraborty.
Has it been approved?
No. The application was lapsed on 27 Dec 2024, so it is no longer under consideration.
Where is it?
In Gar Panchkot, Neturia, Puruliya, West Bengal.
How big is it?
It has a stated cost of ₹2,567.5 crore and 2.4 acres (1 ha) of forest land.
When was it filed?
The application was filed on 12 Nov 2024.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Surface Based Water Supply Scheme Northern Zone Under Purulia Division, Phe Dte.
Project details
| Status | Lapsed |
|---|---|
| Status since | 27 Dec 2024 |
| Application filed | 12 Nov 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Supriya Chakraborty |
| Forest land | 2.4 acres (1 ha) |
| Project cost | ₹2,567.5 crore |
| Village / locality | Gar Panchkot |
| Taluk / tehsil | Neturia |
| District | Puruliya |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02082 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 Sept 2025 | More information requested | 3.5 acres | ₹3 lakh |
| New project filed 12 Nov 2024 (this page) | Lapsed | ₹2,567.5 crore | |
| New project filed 3 Sept 2024 | Lapsed | ₹2,515.4 crore |
In context
7 applications in Puruliya since January 2022 are in the same category (Water & irrigation): 1 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gar Panchkot, Neturia, Puruliya, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Surface Based Water Supply Scheme Northern Zone Under Purulia Division, Phe Dte. — lapsed, 250 m away
- Surface Based Water Supply Scheme Northern Zone Under Purulia Division, Phe Dte. — more information requested, 350 m away
- Greenfield Steel Plant for Production of 1.7 MTPA Pellets, 1.320 MTPA Sponge… — returned to applicant, 2.7 km away
- Palashbithi — lapsed, 3.4 km away
- Sponge Iron Plant (4x100 TPD Kilns), Induction Furnaces (3x20 T), 1,40,000 TPA… — environmental approval granted, 4 km away
- Application of "No Increase in Pollution Load" Certificate for Change in… — initial checks, 4.1 km away
- Transfer of Environment Clearance due to change in Change in CIN & GSTIN… — environmental approval granted, 4.1 km away
- Transfer of Environment Clearance due to change in Change in CIN & GSTIN… — withdrawn, 4.1 km away
More from Supriya Chakraborty in Puruliya
- Surface Based W/S Scheme for Southern Sector under Purulia District, Purulia… — under forest review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.