Project details
| Status | Lapsed |
|---|---|
| Status since | 25 Oct 2025 |
| Application filed | 15 Feb 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Railways & metro |
| Applicant | North East Frontier Railway |
| Land area | 8.3 acres (3.4 ha) |
| Forest land | 8.3 acres (3.3 ha) |
| Project cost | ₹805.6 crore |
| Village / locality | Riyang Railway Station |
| Taluk / tehsil | Kalimpong -I |
| District | Kalimpong |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02203 |
In context
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Riyang Railway Station, Kalimpong -I, Kalimpong, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G Saturation Project in uncovered village Birik Dara — forest land use approved, 450 m away
- LAYING OFC Span(Sitong Forest-Bara Mungwa) FROM KALIJHORA (MTGR-9002) TO… — lapsed, 1.5 km away
- Proposed 0.0308 Ha Land to Be Diverted for Pumping Based Piped Water Supply… — forest land use approved, 2.6 km away
- 4G Saturation Project in Uncovered village Nazok — more information requested, 3 km away
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for… — lapsed, 3.7 km away
- Jal Jeevan Misison(Jjm) Scheme for Gravity Based Water Supply Scheme for… — lapsed, 4.1 km away
- Jal Jeevan Misison(Jjm) Scheme for Gravity Based Water Supply Scheme for… — more information requested, 4.2 km away
- Slope Protection and Landslide Mitigation at 2 Vulnerable Locations ( Km… — more information requested, 4.4 km away
All 8 North East Frontier Railway projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.