Project details
| Status | Forest land use approved |
|---|---|
| Status since | 22 Apr 2026 |
| Application filed | 5 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 180 m² |
| Project cost | ₹1 crore |
| Village / locality | Forest Birik |
| Taluk / tehsil | Kalimpong -I |
| District | Kalimpong |
| State | West Bengal |
| Location from | Site area on record |
| Our reference | WID-WB-02149 |
In context
19 applications in Kalimpong since January 2022 are in the same category (Telecom): 8 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0 acres, this one is smaller than 82% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Forest Birik, Kalimpong -I, Kalimpong, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Total - 3.346 Ha , 2.024 Ha under Darjeeling Forest Division for permanent use… — lapsed, 450 m away
- LAYING OFC Span(Sitong Forest-Bara Mungwa) FROM KALIJHORA (MTGR-9002) TO… — lapsed, 1.8 km away
- Proposed 0.0308 Ha Land to Be Diverted for Pumping Based Piped Water Supply… — forest land use approved, 3.1 km away
- 4G Saturation Project in Uncovered village Nazok — more information requested, 3.2 km away
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for… — lapsed, 4 km away
- Jal Jeevan Misison(Jjm) Scheme for Gravity Based Water Supply Scheme for… — lapsed, 4.2 km away
- Jal Jeevan Misison(Jjm) Scheme for Gravity Based Water Supply Scheme for… — more information requested, 4.3 km away
- Slope Protection and Landslide Mitigation at 2 Vulnerable Locations ( Km… — more information requested, 4.8 km away
More from Mahesh Nair in Kalimpong
- 4G Saturation Project in Uncovered Village KITAPSI — more information requested
- 4G Saturation Project in Uncovered Village DALGAON — more information requested
- 4G Saturation Project in Uncovered Village Paren Forest — more information requested
- ADSS OFC Laying of 18.433 Km under 4G Saturation DBN Funded Project of GOI — more information requested
- 4G saturation Project in uncovered village Mangpong Forest — forest land use approved
- 4G Saturation Project — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.