Project details
| Status | More information requested |
|---|---|
| Status since | 17 Sept 2026 |
| Application filed | 18 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹1 crore |
| Village / locality | Ringkingpong |
| Taluk / tehsil | Kalimpong -I |
| District | Kalimpong |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02339 |
In context
19 applications in Kalimpong since January 2022 are in the same category (Telecom): 8 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0 acres, this one is smaller than 82% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ringkingpong, Kalimpong -I, Kalimpong, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jal Jeevan Misison(Jjm) Scheme for Gravity Based Water Supply Scheme for… — more information requested, 1.3 km away
- Jal Jeevan Misison(Jjm) Scheme for Gravity Based Water Supply Scheme for… — lapsed, 1.3 km away
- LAYING OFC Span(Sitong Forest-Bara Mungwa) FROM KALIJHORA (MTGR-9002) TO… — lapsed, 1.6 km away
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for… — lapsed, 1.8 km away
- Laying of 11KV Feeder From Suruk Sal Dara to Shapekhola — more information requested, 2.1 km away
- Slope Protection and Landslide Mitigation at 2 Vulnerable Locations ( Km… — more information requested, 2.3 km away
- Slope Protection and Landslide Mitigation at 2 Vulnerable locations viz. Km… — forest land use approved, 2.9 km away
- Slope Protection and Landslide Mitigation at 2 Vulnerable locations viz. Km… — lapsed, 2.9 km away
More from Mahesh Nair in Kalimpong
- 4G Saturation Project in Uncovered Village KITAPSI — more information requested
- 4G Saturation Project in Uncovered Village DALGAON — more information requested
- 4G Saturation Project in Uncovered Village Paren Forest — more information requested
- ADSS OFC Laying of 18.433 Km under 4G Saturation DBN Funded Project of GOI — more information requested
- 4G saturation Project in uncovered village Mangpong Forest — forest land use approved
- 4G Saturation Project — forest land use approved
About this information