Quick answers
What is Sri S.B.V Reddy?
Sri S.B.V Reddy is an approved mining project in Gantivaripalem, Addateegala, Alluri Sitharama Raju, Andhra Pradesh. The site covers 9.9 acres.
Who is building it?
The applicant is Sabbella Reddy.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Nov 2022), as of 27 Nov 2026.
Where is it?
In Gantivaripalem, Addateegala, Alluri Sitharama Raju, Andhra Pradesh.
How big is it?
It has a stated cost of ₹50 lakh and a site of 9.9 acres.
When was it filed?
The application was filed on 26 Nov 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Nov 2022 |
| Application filed | 26 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sabbella Reddy |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Gantivaripalem |
| Taluk / tehsil | Addateegala |
| District | Alluri Sitharama Raju |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00024 |
In context
44 applications in Alluri Sitharama Raju since January 2022 are in the same category (Mining): 35 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 9.9 acres, this one is smaller than 61% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Gantivaripalem, Addateegala, Alluri Sitharama Raju, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sri Ramavath Krishna Naik — environmental approval granted, 18.8 km away
- Widening to Two Lane With Paved Shoulder of Rampachodavaram - Koyyuru Section… — forest land use approved, 19 km away
- Reconnaissance survey for Iron ore, Graphite and associated in mineralization… — initial checks, 21.5 km away
- Preliminary exploration for Graphite and associated mineralization in… — forest land use approved, 23.4 km away
- Mining project by M/s. The Aishwarya Tribal Labour Contract Mutually Aided… — cleared for impact study, 23.5 km away
- Mining project by M/s. The Aishwarya Tribal Labour Contract Mutually Aided… — cleared for impact study, 26.3 km away
- Proposed Road Metal & Ballast, Rough Stone, Boulders & Ordinary Earth Mining… — environmental approval granted, 27.1 km away
- Proposed Road Metal & Ballast, Rough Stone, Boulders & Ordinary Earth Mining… — environmental approval granted, 27.2 km away
About this information