Quick answers
What is this project?
Reconnaissance survey for Iron ore, Graphite and associated in mineralization in D. Bhimavaram -Tirumalawada area, Alluri Sitharama Raju District, Andhra Pradesh is a proposed mining project in Jajipalem, Addateegala, Alluri Sitharama Raju, Andhra Pradesh. The site covers 61.8 acres.
Who is building it?
The applicant is Geological Survey of India, Southern Region, Hyderabad.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Jajipalem, Addateegala, Alluri Sitharama Raju, Andhra Pradesh.
How big is it?
It has a stated cost of ₹50 lakh; a site of 61.8 acres and 51.9 acres (21 ha) of forest land.
When was it filed?
The application was filed on 24 Feb 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 16 Apr 2026 |
| Application filed | 24 Feb 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Geological Survey of India, Southern Region, Hyderabad |
| Land area | 61.8 acres (25 ha) |
| Forest land | 51.9 acres (21 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Jajipalem |
| Taluk / tehsil | Addateegala |
| District | Alluri Sitharama Raju |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04726 |
In context
44 applications in Alluri Sitharama Raju since January 2022 are in the same category (Mining): 35 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 61.8 acres, this one is larger than 89% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Jajipalem, Addateegala, Alluri Sitharama Raju, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s. The Aishwarya Tribal Labour Contract Mutually Aided… — cleared for impact study, 2.4 km away
- Widening to Two Lane With Paved Shoulder of Rampachodavaram - Koyyuru Section… — forest land use approved, 2.6 km away
- Mining project by M/s. The Aishwarya Tribal Labour Contract Mutually Aided… — cleared for impact study, 5.2 km away
- Preliminary exploration for Graphite and associated mineralization in… — forest land use approved, 9.7 km away
- Sri Ramavath Krishna Naik — environmental approval granted, 12 km away
- Mining project by M/s. Samrudhi Minerals and Processors — cleared for impact study, 15.1 km away
- Sri S.B.V Reddy — environmental approval granted, 21.5 km away
- Proposed Road Metal & Ballast, Rough Stone, Boulders & Ordinary Earth Mining… — environmental approval granted, 25.8 km away
More from Geological Survey of India, Southern Region, Hyderabad in Alluri Sitharama Raju
- Preliminary exploration for Graphite and associated mineralization in… — forest land use approved
All 170 Geological Survey of India (GSI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.