What is Developing? Open the mapMap

Returned to applicantIndustry · Sri Sathya Sai, Andhra Pradesh

Proposed Expansion of Existing Steel Plant by Installation of 2x15 T Induction Furnaces in addition to the existing 1X15 T Induction Furnace for Ultimate Production of 99,900 TPA Billets and Enhancement of the Production Capacity of the Rolling Mill By 67,033 TPA, for Ultimate Production of 94,905 TPA Structurals, Angles, TMT Bars, etc.

Proposed Expansion of Existing Steel Plant by Installation of 2x15 T Induction Furnaces in addition to the existing 1X15 T Induction Furnace for Ultimate Production of 99,900 TPA Billets and Enhancement of the Production Capacity of the Rolling Mill By 67,033 TPA, for Ultimate Production of 94,905 TPA Structurals, Angles, TMT Bars, etc is a proposed industrial project in Gollapuram, Hindupur, Sri Sathya Sai, Andhra Pradesh. The site covers 10.8 acres. Its stated project cost is ₹12.8 crore. As of 27 Nov 2026, its status is “Returned to applicant” (since 3 Oct 2023).

See it on the live map All projects in Sri Sathya Sai

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion of Existing Steel Plant by Installation of 2x15 T Induction Furnaces in addition to the existing 1X15 T Induction Furnace for Ultimate Production of 99,900 TPA Billets and Enhancement of the Production Capacity of the Rolling Mill By 67,033 TPA, for Ultimate Production of 94,905 TPA Structurals, Angles, TMT Bars, etc is a proposed industrial project in Gollapuram, Hindupur, Sri Sathya Sai, Andhra Pradesh. The site covers 10.8 acres.

Who is building it?

The applicant is Adishakti Smelters Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.

Where is it?

In Gollapuram, Hindupur, Sri Sathya Sai, Andhra Pradesh.

How big is it?

It has a stated cost of ₹12.8 crore and a site of 10.8 acres.

When was it filed?

The application was filed on 6 Sept 2023.

Project details

StatusReturned to applicant
Status since3 Oct 2023
Application filed6 Sept 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantAdishakti Smelters Private Limited
Land area10.8 acres (4.4 ha)
Project cost₹12.8 crore
Village / localityGollapuram
Taluk / tehsilHindupur
DistrictSri Sathya Sai
StateAndhra Pradesh
Location fromSite boundary on record
Our referenceWID-AP-00375

In context

32 applications in Sri Sathya Sai since January 2022 are in the same category (Industry): 17 approved, 7 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 10.8 acres, this one is smaller than 66% of them.

30 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Gollapuram, Hindupur, Sri Sathya Sai, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Adishakti Smelters Private Limited in Sri Sathya Sai

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.