What is Developing? Open the mapMap

Cleared for impact studyIndustry · Sri Sathya Sai, Andhra Pradesh

Expansion of Ferro Alloys Plant by Addition of 2 X 16.5 MVA SAF with Existing 1 X 12.5 MVA & 1 X9 MVA SAF to Produce Different Alloys with Existing Plant

Expansion of Ferro Alloys Plant by Addition of 2 X 16.5 MVA SAF with Existing 1 X 12.5 MVA & 1 X9 MVA SAF to Produce Different Alloys with Existing Plant is a proposed industrial project in Gollapuram, Hindupur, Sri Sathya Sai, Andhra Pradesh. The site covers 35.7 acres. Its stated project cost is ₹175 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 6 Jul 2026).

See it on the live map All projects in Sri Sathya Sai

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Ferro Alloys Plant by Addition of 2 X 16.5 MVA SAF with Existing 1 X 12.5 MVA & 1 X9 MVA SAF to Produce Different Alloys with Existing Plant is a proposed industrial project in Gollapuram, Hindupur, Sri Sathya Sai, Andhra Pradesh. The site covers 35.7 acres.

Who is building it?

The applicant is Oswal Smelters Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 6 Jul 2026), as of 27 Nov 2026.

Where is it?

In Gollapuram, Hindupur, Sri Sathya Sai, Andhra Pradesh.

How big is it?

It has a stated cost of ₹175 crore and a site of 35.7 acres.

When was it filed?

The application was filed on 1 May 2026.

Project details

StatusCleared for impact study
Status since6 Jul 2026
Application filed1 May 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantOswal Smelters Private Limited
Land area35.7 acres (14.5 ha)
Project cost₹175 crore
Village / localityGollapuram
Taluk / tehsilHindupur
DistrictSri Sathya Sai
StateAndhra Pradesh
Location fromSite boundary on record
Our referenceWID-AP-04032

In context

32 applications in Sri Sathya Sai since January 2022 are in the same category (Industry): 17 approved, 7 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 35.7 acres, this one is larger than 75% of them.

30 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Gollapuram, Hindupur, Sri Sathya Sai, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Oswal Smelters Private Limited in Sri Sathya Sai

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.