Quick answers
What is this project?
Change of product mix in Noble Ferro Alloy with Maximum Production Capacity of 13,000TPA within the Permissible Production Quantity as per EC in either or combination by M/s Oswal Smelters Pvt. Ltd is a proposed industrial building project in Gollapuram, Hindupur, Sri Sathya Sai, Andhra Pradesh. The site covers 35.7 acres.
Who is building it?
The applicant is Oswal Smelters Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Gollapuram, Hindupur, Sri Sathya Sai, Andhra Pradesh.
How big is it?
It has a stated cost of ₹55 lakh and a site of 35.7 acres.
When was it filed?
The application was filed on 30 Aug 2024.
Project details
| Official title | Change of product mix in Noble Ferro Alloy with Maximum Production Capacity of 13,000TPA within the Permissible Production Quantity as per EC in either or combination by M/s Oswal Smelters Pvt. Ltd. at Village – Gollapuram, Mandal - Hindupur, District – Ananthapur, State – Andhra Pradesh |
|---|---|
| Status | Initial checks |
| Status since | 30 Aug 2024 |
| Application filed | 30 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Oswal Smelters Private Limited |
| Use | Industrial |
| Land area | 35.7 acres (14.5 ha) |
| Plot area | 1,44,500 m² (15,55,384 sq ft) |
| Project cost | ₹55 lakh |
| Village / locality | Gollapuram |
| Taluk / tehsil | Hindupur |
| District | Sri Sathya Sai |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-01964 |
In context
30 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gollapuram, Hindupur, Sri Sathya Sai, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Ferro Alloys Plant by Addition of 2 X 16.5 MVA SAF with Existing… — cleared for impact study, 0 m away
- Transfer of the Environmental Clearance of the Existing Mini-steel Plant from… — lapsed, 250 m away
- Industrial project by M/s. KUBAIR STEEL AND POWER LLP — withdrawn, 250 m away
- Proposed to establish Bulk Drugs & Drug Intermediates Manufacturing unit by… — under environmental review, 650 m away
- Proposed Expansion of Existing Steel Plant by Installation of 2x15 T Induction… — lapsed, 850 m away
- Proposed Expansion of Existing Steel Plant by Installation of 2x15 T Induction… — returned to applicant, 850 m away
- Change in Company name in the Environmental Clearance (EC) for Ferro Alloy… — environmental approval granted, 950 m away
- M.S. Ingot plant 48 TPD. — returned to applicant, 1.1 km away
More from Oswal Smelters Private Limited in Sri Sathya Sai
- Expansion of Ferro Alloys Plant by Addition of 2 X 16.5 MVA SAF with Existing… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.