Quick answers
What is Gujjili Pumped Storage Hydro Electric Project (1500 MW)?
Gujjili Pumped Storage Hydro Electric Project (1500 MW) is a proposed water and irrigation project in Tangulaguda, Araku Valley, Alluri Sitharama Raju, Andhra Pradesh. The site covers 673.1 acres.
Who is building it?
The applicant is New and Renewable Energy Development Corporation of Andhra Pradesh LTD (Nredcap).
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 7 Aug 2023), as of 27 Nov 2026.
Where is it?
In Tangulaguda, Araku Valley, Alluri Sitharama Raju, Andhra Pradesh.
How big is it?
It has a stated cost of ₹6,535.3 crore and a site of 673.1 acres.
When was it filed?
The application was filed on 12 Jun 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 7 Aug 2023 |
| Application filed | 12 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | New and Renewable Energy Development Corporation of Andhra Pradesh LTD (Nredcap) |
| Land area | 673.1 acres (272.4 ha) |
| Project cost | ₹6,535.3 crore |
| Village / locality | Tangulaguda |
| Taluk / tehsil | Araku Valley |
| District | Alluri Sitharama Raju |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00754 |
In context
8 applications in Alluri Sitharama Raju since January 2022 are in the same category (Water & irrigation): 8 approved, 0 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tangulaguda, Araku Valley, Alluri Sitharama Raju, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Gujjili Pumped Storage Project, District-Alluri Sitharama Raju,… — cleared for impact study, 500 m away
- Adventure Tourism Project in Comp No. 475 of Borra Reserved Forest in… — lapsed, 9.7 km away
- Diversion of 0.28Ha of Forest Land at Borra Reserve Forest Land in Ananthagiri… — lapsed, 9.8 km away
- Doubling Railway Project between Boddavara - Karakavalasa (From Km-33.254 to… — more information requested, 12.6 km away
- Diversion of Forest land of extent 0.25Ha for establishment of Adventure… — lapsed, 13.4 km away
- Diversion of Forest land of extent 0.74Ha for establishment of Adventure… — lapsed, 13.4 km away
- Sri. Suprakash Das (Formerly Smt. Das Chinnammi) — environmental approval granted, 14.3 km away
- Doubling Railway Project between Baddabara - Karakavalasa (from Km-33.254 to… — lapsed, 14.3 km away
More from New and Renewable Energy Development Corporation of Andhra Pradesh LTD (Nredcap) in Alluri Sitharama Raju
- Chittamvalasa Pumped Storage Hydro-Electric Project (800 MW) — cleared for impact study
All 32 New & Renewable Energy Development Corporation of Andhra Pradesh projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.