Quick answers
What is this project?
Proposed Gujjili Pumped Storage Project, District-Alluri Sitharama Raju, Andhra Pradesh is a proposed water and irrigation project in Marriguda, Araku Valley, Alluri Sitharama Raju, Andhra Pradesh. The site covers 8,456.9 acres.
Who is building it?
The applicant is Navauga Enegineering Company Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 3 Oct 2025), as of 27 Nov 2026.
Where is it?
In Marriguda, Araku Valley, Alluri Sitharama Raju, Andhra Pradesh.
How big is it?
It has a stated cost of ₹11,722.7 crore and a site of 8,456.9 acres.
When was it filed?
The application was filed on 30 Aug 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 3 Oct 2025 |
| Application filed | 30 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Navauga Enegineering Company Limited |
| Land area | 8,456.9 acres (3,422.4 ha) |
| Project cost | ₹11,722.7 crore |
| Village / locality | Marriguda |
| Taluk / tehsil | Araku Valley |
| District | Alluri Sitharama Raju |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-02955 |
In context
8 applications in Alluri Sitharama Raju since January 2022 are in the same category (Water & irrigation): 8 approved, 0 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Marriguda, Araku Valley, Alluri Sitharama Raju, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Gujjili Pumped Storage Hydro Electric Project (1500 MW) — cleared for impact study, 500 m away
- Adventure Tourism Project in Comp No. 475 of Borra Reserved Forest in… — lapsed, 10 km away
- Diversion of 0.28Ha of Forest Land at Borra Reserve Forest Land in Ananthagiri… — lapsed, 10.1 km away
- Doubling Railway Project between Boddavara - Karakavalasa (From Km-33.254 to… — more information requested, 12.8 km away
- Diversion of Forest land of extent 0.25Ha for establishment of Adventure… — lapsed, 13.8 km away
- Diversion of Forest land of extent 0.74Ha for establishment of Adventure… — lapsed, 13.8 km away
- Doubling Railway Project between Baddabara - Karakavalasa (from Km-33.254 to… — lapsed, 14.5 km away
- Doubling Railway Project between Baddabara - Karakavalasa (from Km-33.254 to… — lapsed, 14.5 km away
More from Navauga Enegineering Company Limited in Alluri Sitharama Raju
- Proposed Chittamvalasa Pumped Storage Project — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.