Quick answers
What is this project?
Environmental Impact Assessment Study Related to Crz Clearance for Setting Up 200 Mld Desalination Plant and Discharge of Brine With Treated Effluent for Indosol Solar Private Limited at Ramayapatnam, Andhra Pradesh is a withdrawn power project in Chennayapalem, Kavali, Nellore, Andhra Pradesh. The site covers 56.3 acres.
Who is building it?
The applicant is Manoj Kumar Reddy Pothireddy.
Has it been approved?
No. The application was withdrawn on 24 Mar 2025, so it is no longer under consideration.
Where is it?
In Chennayapalem, Kavali, Nellore, Andhra Pradesh.
How big is it?
It has a stated cost of ₹900 crore and a site of 56.3 acres.
When was it filed?
The application was filed on 24 Mar 2025.
Project details
| Status | Withdrawn |
|---|---|
| Status since | 24 Mar 2025 |
| Application filed | 24 Mar 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Power |
| Applicant | Manoj Kumar Reddy Pothireddy |
| Land area | 56.3 acres (22.8 ha) |
| Project cost | ₹900 crore |
| Village / locality | Chennayapalem |
| Taluk / tehsil | Kavali |
| District | Sri Potti Sriramulu Nellore (Nellore) |
| State | Andhra Pradesh |
| Location from | Site area on record |
| Our reference | WID-AP-05191 |
In context
7 applications in Nellore since January 2022 are in the same category (Power): 4 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chennayapalem, Kavali, Nellore, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Ramayapatnam Greenfield Port Development in Andhra Pradesh (4 km away); BPCL Plans 9 MMTPA Greenfield Refinery and Petrochemical Complex in Andhra Pradesh (4 km away).
Other projects nearby
- Environmental Impact Assessment study for obtaining CRZ clearance for… — coastal clearance granted, 150 m away
- 9 MMTPA Greenfield Refinery and Petrochemical Complex by BPCL — environmental approval granted, 4 km away
- 9 MMTPA Greenfield Refinery and Petrochemical Complex by BPCL — cleared for impact study, 4 km away
- 9 MMTPA Greenfield Refinery and Petrochemical Complex by BPCL — lapsed, 4 km away
- 9 MMTPA Greenfield Refinery and Petrochemical Complex by BPCL — cleared for impact study, 4 km away
- Fish Landing Centre At Murthumpeta, SPSR Nellore District, Andhra Pradesh — recommended by coastal authority, 6.2 km away
- EC application for Construction of Industrial Buildings to establish Solar… — environmental approval granted, 6.5 km away
- Greenfield Non-Major Port at Ramayapatnam — environmental approval granted, 6.6 km away
More from Manoj Kumar Reddy Pothireddy in Sri Potti Sriramulu Nellore
- Industrial Buildings to establish Solar Modules Manufacturing Facility with… — environmental approval granted
- EC application for Construction of Industrial Buildings to establish Solar… — environmental approval granted
- Diversion of 5.55 ha of forest land for laying of 33kV Double Circuit… — forest land use approved
- Diversion of 33.11 Ha. of Forest Land for Quarry Lease for Extraction of… — lapsed
- Industrial Buildings to establish Solar Modules Manufacturing Facility with… — cleared for impact study
- Environmental Impact Assessment study for obtaining CRZ clearance for… — coastal clearance granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.