Quick answers
What is this project?
Proposed Enhancement of Quarrying Operations for Laterite Ore : Jartha Lakshmana Rao is a proposed mining project in Boyapadu, Rajavommangi, Alluri Sitharama Raju, Andhra Pradesh. The site covers 299 acres.
Who is building it?
The applicant is Jartha Lakshmana Rao.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 19 Mar 2026), as of 27 Nov 2026.
Where is it?
In Boyapadu, Rajavommangi, Alluri Sitharama Raju, Andhra Pradesh.
How big is it?
It has a stated cost of ₹1.5 crore and a site of 299 acres.
When was it filed?
The application was filed on 15 Dec 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 19 Mar 2026 |
| Application filed | 15 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Jartha Lakshmana Rao |
| Land area | 299 acres (121 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Boyapadu |
| Taluk / tehsil | Rajavommangi |
| District | Alluri Sitharama Raju |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-01974 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 17 Nov 2026 | Under environmental review | 299 acres | ₹1.5 crore |
| Early planning filed 15 Dec 2025 (this page) | Cleared for impact study | 299 acres | ₹1.5 crore |
In context
44 applications in Alluri Sitharama Raju since January 2022 are in the same category (Mining): 35 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 299 acres, this one is larger than 93% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Boyapadu, Rajavommangi, Alluri Sitharama Raju, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Enhancement of Quarrying Operations for Laterite Ore : Jartha… — under environmental review, 0 m away
- Sri N. Musili Babu — environmental approval granted, 16.7 km away
- Sri Ramavath Krishna Naik — environmental approval granted, 18.4 km away
- Sri B. Rajendra Prasad — lapsed, 25 km away
- Sri B. Rajendra Prasad — cleared for impact study, 25 km away
- Smt. Pujari Parvathamma — environmental approval granted, 26.2 km away
- Smt. Pujari Parvathamma — not approved, 26.2 km away
- Reconnaissance survey for Iron ore, Graphite and associated in mineralization… — initial checks, 29.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.