Quick answers
What is Bsnl 4g Saturation Project_modela_eluru_ap?
Bsnl 4g Saturation Project_modela_eluru_ap is a proposed project in Perantapalle Rf, Velairpadu, Eluru, Andhra Pradesh. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Perantapalle Rf, Velairpadu, Eluru, Andhra Pradesh.
How big is it?
It has a stated cost of ₹1 crore and a site of 0 acres.
When was it filed?
The application was filed on 23 Mar 2026.
Project details
| Status | Under wildlife review |
|---|---|
| Status since | 12 Nov 2026 |
| Application filed | 23 Mar 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Project cost | ₹1 crore |
| Village / locality | Perantapalle Rf |
| Taluk / tehsil | Velairpadu |
| District | Eluru |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-05100 |
In context
15 applications in Eluru since January 2022 are in the same category (Other): 0 approved, 9 filed or under review, and 3 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
Where it is
Perantapalle Rf, Velairpadu, Eluru, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Road from Gurugumilli to Puchiokagondi via Chintakonda, Gottalarevu — in-principle approval, conditions pending, 8.3 km away
- Road From Chintapalli to Urrinka of Buttayagudem Mandal — more information requested, 10.3 km away
- Bsnl 4g Saturation Project_dharwada_eluru_ap — lapsed, 11.3 km away
- Bsnl 4g Saturation Project_dharwada_eluru_ap — decision issued, 11.3 km away
- Laying underground OFC along the roads between "Koyyalgudem-Kannapuram-Gogumill… — more information requested, 12.3 km away
- Laying underground OFC along the roads between "Koyyalgudem-Kannapuram-Gogumill… — forest land use approved, 12.3 km away
- Bsnl 4g Saturation Project_ginnepalli_eluru_ap — under wildlife review, 13.2 km away
- Diversion of 0.04 Ha of Forest Land for Construction of Mobile Tower for… — under wildlife review, 14.7 km away
More from Mahesh Nair in Eluru
- Bsnl 4g Saturation Project_chimaluru_eluru_ap — under wildlife review
- Bsnl 4g Saturation Project_ginnepalli_eluru_ap — under wildlife review
- Bsnl 4g Saturation Project_tangedukonda_eluru_ap — under wildlife review
- Bsnl 4g Saturation Project_chimaluru_eluru_ap — more information requested
- Bsnl 4g Saturation Project_methapukota_eluru_ap — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.