Quick answers
What is Demwe Lower Hydroelectric Project?
Demwe Lower Hydroelectric Project is a proposed water and irrigation project in Tidding, Tezu Hq, Lohit, Arunachal Pradesh. The site covers 3,928.9 acres.
Who is building it?
The applicant is Greenko Demwe Power Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Tidding, Tezu Hq, Lohit, Arunachal Pradesh.
How big is it?
It has a stated cost of ₹8,347.9 crore and a site of 3,928.9 acres.
When was it filed?
The application was filed on 24 Dec 2025.
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 21 Jan 2026 |
| Application filed | 24 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Water & irrigation |
| Applicant | Greenko Demwe Power Limited |
| Land area | 3,928.9 acres (1,590 ha) |
| Project cost | ₹8,347.9 crore |
| Village / locality | Tidding |
| Taluk / tehsil | Tezu Hq |
| District | Lohit |
| State | Arunachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AR-00034 |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tidding, Tezu Hq, Lohit, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Permission for Borehole Drilling in Lohit Forest Division for Construction of… — forest land use approved, 450 m away
- Demwe Lower Hydroelectric Project — more information requested, 450 m away
- Diversion of Forest Land for construction of Microwave Tower at Udayak Pass by… — lapsed, 3.9 km away
- 33kV Line From Tezu To Wakro Under Comprehensive Transmission And Distribution… — forest land use approved, 11.7 km away
- 4g Saturation Project Arp — under wildlife review, 14.7 km away
- Kamlang Small Hydro Power Project 24.6 MW — forest land use approved, 20.1 km away
- Obtaining Forest Clearance : Bffr — not approved, 22.2 km away
- Proposed Onshore Oil & Gas Exploration for Loc. OCKA in OALP-I Block… — environmental approval granted, 32.2 km away
More from Greenko Demwe Power Limited in Lohit
- Permission for Borehole Drilling in Lohit Forest Division for Construction of… — forest land use approved
- Demwe Lower Hydroelectric Project — more information requested
3 Greenko Demwe Power projects in Lohit
All 4 Greenko Demwe Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.