Quick answers
What is 4g Saturation Project Arp?
4g Saturation Project Arp is a proposed project in Tafra Gam, Tezu Hq, Lohit, Arunachal Pradesh. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Tafra Gam, Tezu Hq, Lohit, Arunachal Pradesh.
How big is it?
It has a stated cost of ₹1.3 crore and a site of 0 acres.
When was it filed?
The application was filed on 18 May 2024.
Project details
| Status | Under wildlife review |
|---|---|
| Status since | 18 May 2024 |
| Application filed | 18 May 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Project cost | ₹1.3 crore |
| Village / locality | Tafra Gam |
| Taluk / tehsil | Tezu Hq |
| District | Lohit |
| State | Arunachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AR-00284 |
In context
9 applications in Lohit since January 2022 are in the same category (Other): 5 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2.2 years from filing to approval.
Where it is
Tafra Gam, Tezu Hq, Lohit, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 33kV Line From Tezu To Wakro Under Comprehensive Transmission And Distribution… — forest land use approved, 9.1 km away
- Obtaining Forest Clearance : Bffr — not approved, 10.3 km away
- Diversion of Forest Land for construction of Microwave Tower at Udayak Pass by… — lapsed, 10.8 km away
- Permission for Borehole Drilling in Lohit Forest Division for Construction of… — forest land use approved, 14.7 km away
- Demwe Lower Hydroelectric Project — more information requested, 14.7 km away
- Demwe Lower Hydroelectric Project — returned to applicant, 14.7 km away
- Proposed Onshore Oil & Gas Exploration for Loc. OCKA in OALP-I Block… — environmental approval granted, 25.9 km away
- Kamlang Small Hydro Power Project 24.6 MW — forest land use approved, 26 km away
More from Mahesh Nair in Lohit
- 4G Saturation project Arunachal Pradesh — forest land use approved
- 4G Saturation project Arunachal Pradesh — forest land use approved
- 4G Saturation project Arunachal Pradesh — forest land use approved
- 4G Saturation project Arunachal Pradesh — forest land use approved
- 4G Saturation project Arunachal Pradesh — forest land use approved
- 4G Saturation project Arunachal Pradesh — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.