Quick answers
What is this project?
33kV Line From Tezu To Wakro Under Comprehensive Transmission And Distribution Scheme In Arunachal Pradesh is an approved power project in Proshi, Wakro Circle, Lohit, Arunachal Pradesh. The site covers 147.3 acres.
Who is building it?
The applicant is Department of Power Govt of Arunachal Pradesh.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 29 Jan 2026), as of 27 Nov 2026.
Where is it?
In Proshi, Wakro Circle, Lohit, Arunachal Pradesh.
How big is it?
It has a stated cost of ₹14.2 crore; a site of 147.3 acres and 147.3 acres (59.6 ha) of forest land.
When was it filed?
The application was filed on 24 May 2023.
Project details
| Official title | Construction Of 33kV Line From Tezu To Wakro Under Comprehensive Transmission And Distribution Scheme In Arunachal Pradesh. |
|---|---|
| Status | Forest land use approved |
| Status since | 29 Jan 2026 |
| Application filed | 24 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Department of Power Govt of Arunachal Pradesh |
| Land area | 147.3 acres (59.6 ha) |
| Forest land | 147.3 acres (59.6 ha) |
| Project cost | ₹14.2 crore |
| Village / locality | Proshi |
| Taluk / tehsil | Wakro Circle |
| District | Lohit |
| State | Arunachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AR-00200 |
Where it is
Proshi, Wakro Circle, Lohit, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for construction of Microwave Tower at Udayak Pass by… — lapsed, 8.8 km away
- 4g Saturation Project Arp — under wildlife review, 9.1 km away
- Permission for Borehole Drilling in Lohit Forest Division for Construction of… — forest land use approved, 11.4 km away
- Demwe Lower Hydroelectric Project — more information requested, 11.4 km away
- Demwe Lower Hydroelectric Project — returned to applicant, 11.7 km away
- Kamlang Small Hydro Power Project 24.6 MW — forest land use approved, 16.9 km away
- Obtaining Forest Clearance : Bffr — not approved, 19.4 km away
- Proposed Onshore Oil & Gas Exploration for Loc. OCKA in OALP-I Block… — environmental approval granted, 21.1 km away
All 6 Department of Power Govt of Arunachal Pradesh projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.