Quick answers
What is this project?
Diversion of Forest Land for construction of Microwave Tower at Udayak Pass by Indian Army is a lapsed telecom project in Hawa Camp, Tezu Hq, Lohit, Arunachal Pradesh. The site covers 0.2 acres.
Who is building it?
The applicant is Ministry of Defense.
Has it been approved?
No. The application was lapsed on 4 May 2025, so it is no longer under consideration.
Where is it?
In Hawa Camp, Tezu Hq, Lohit, Arunachal Pradesh.
How big is it?
It has a site of 0.2 acres and 730 m² of forest land.
When was it filed?
The application was filed on 17 Jun 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 4 May 2025 |
| Application filed | 17 Jun 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Ministry of Defense |
| Land area | 700 m² |
| Forest land | 730 m² |
| Village / locality | Hawa Camp |
| Taluk / tehsil | Tezu Hq |
| District | Lohit |
| State | Arunachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AR-00137 |
In context
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hawa Camp, Tezu Hq, Lohit, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Permission for Borehole Drilling in Lohit Forest Division for Construction of… — forest land use approved, 3.9 km away
- Demwe Lower Hydroelectric Project — more information requested, 3.9 km away
- Demwe Lower Hydroelectric Project — returned to applicant, 3.9 km away
- 33kV Line From Tezu To Wakro Under Comprehensive Transmission And Distribution… — forest land use approved, 8.8 km away
- 4g Saturation Project Arp — under wildlife review, 10.8 km away
- Obtaining Forest Clearance : Bffr — not approved, 18.7 km away
- Kamlang Small Hydro Power Project 24.6 MW — forest land use approved, 20.6 km away
- Proposed Onshore Oil & Gas Exploration for Loc. OCKA in OALP-I Block… — environmental approval granted, 29.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.