Quick answers
What is this project?
Diversion of forest land measuring 0.27 Ha for construction of SV-01 Station for Gohpur – Itanagar Pipeline Project is an approved pipeline project in Balijan Karbi, Banderdawa, Papum Pare, Arunachal Pradesh. The site covers 0.7 acres.
Who is building it?
The applicant is Indradhanush Gas Grid Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 17 Sept 2024), as of 27 Nov 2026.
Where is it?
In Balijan Karbi, Banderdawa, Papum Pare, Arunachal Pradesh.
How big is it?
It has a stated cost of ₹4 crore; a site of 0.7 acres and 2,700 m² of forest land.
When was it filed?
The application was filed on 18 Sept 2023.
Project details
| Official title | Proposal for Diversion of forest land measuring 0.27 Ha for construction of SV-01 Station for Gohpur – Itanagar Pipeline Project |
|---|---|
| Status | Forest land use approved |
| Status since | 17 Sept 2024 |
| Application filed | 18 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Indradhanush Gas Grid Limited |
| Land area | 2,700 m² |
| Forest land | 2,700 m² |
| Project cost | ₹4 crore |
| Village / locality | Balijan Karbi |
| Taluk / tehsil | Banderdawa |
| District | Papum Pare |
| State | Arunachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AR-00167 |
In context
6 applications in Papum Pare since January 2022 are in the same category (Pipelines): 2 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Balijan Karbi, Banderdawa, Papum Pare, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Grain-Based Distillery for production of 225 KLD Extra Neutral… — withdrawn, 3.6 km away
- Proposed Grain-Based Distillery for production of 150 KLD Extra Neutral… — under environmental review, 3.6 km away
- C/o SWM Plant at Dapo Yarlo, Itanagar — initial checks, 4.6 km away
- C/o SWM Plant at Dapo Yarlo, Itanagar — lapsed, 4.6 km away
- Diversion of forest land measuring 0.3728 Ha for construction of RT-02 Station… — withdrawn, 7 km away
- Diversion of forest land measuring 0.3728 Ha for construction of RT-02 Station… — lapsed, 7 km away
- Diversion of 14.87 ha of forest land for Establishment of Multi-purpose Sport… — lapsed, 7.6 km away
- 50 TPD Scientific Waste Disposal Facility — under environmental review, 7.8 km away
More from Indradhanush Gas Grid Limited in Papum Pare
- Diversion of forest land measuring 0.3728 Ha for construction of RT-02 Station… — withdrawn
- Diversion of forest land measuring 0.80 Ha for construction of RT Station for… — under wildlife review
- Diversion of forest land measuring 0.80 Ha for construction of RT Station for… — more information requested
- Diversion of forest land measuring 0.3728 Ha for construction of RT-02 Station… — lapsed
- Diversion of forest land measuring 0.80 Ha for construction of RT Station for… — forest land use approved
6 Indradhanush Gas Grid projects in Papum Pare
All 39 Indradhanush Gas Grid projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.