Quick answers
What is C/o SWM Plant at Dapo Yarlo, Itanagar?
C/o SWM Plant at Dapo Yarlo, Itanagar is a proposed industrial project in Balijan Karbi, Banderdawa, Papum Pare, Arunachal Pradesh. The site covers 24.7 acres.
Who is building it?
The applicant is Itanagar Municipal Corporation.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Balijan Karbi, Banderdawa, Papum Pare, Arunachal Pradesh.
How big is it?
It has a stated cost of ₹17.2 crore and a site of 24.7 acres.
When was it filed?
The application was filed on 15 Jul 2024.
Project details
| Status | Initial checks |
|---|---|
| Status since | 15 Jul 2024 |
| Application filed | 15 Jul 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Industry |
| Applicant | Itanagar Municipal Corporation |
| Land area | 24.7 acres (10 ha) |
| Project cost | ₹17.2 crore |
| Village / locality | Balijan Karbi |
| Taluk / tehsil | Banderdawa |
| District | Papum Pare |
| State | Arunachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AR-00283 |
In context
5 applications in Papum Pare since January 2022 are in the same category (Industry): 1 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Balijan Karbi, Banderdawa, Papum Pare, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- C/o SWM Plant at Dapo Yarlo, Itanagar — lapsed, 0 m away
- Diversion of forest land measuring 0.3728 Ha for construction of RT-02 Station… — withdrawn, 2.7 km away
- Diversion of forest land measuring 0.3728 Ha for construction of RT-02 Station… — lapsed, 2.7 km away
- 50 TPD Scientific Waste Disposal Facility — under environmental review, 3.3 km away
- Diversion of 0.0916 ha of forest lend for Establishment of Hindustan Petroleum… — under wildlife review, 4.3 km away
- Diversion of 0.0916 ha of forest lend for Establishment of Hindustan Petroleum… — in-principle approval, conditions pending, 4.3 km away
- Diversion of 0.0916 Ha of Forest Land for Establishment of Iocl Petrol Pump at… — more information requested, 4.3 km away
- Diversion of forest land measuring 0.80 Ha for construction of RT Station for… — under wildlife review, 4.4 km away
More from Itanagar Municipal Corporation in Papum Pare
- 50 TPD Scientific Waste Disposal Facility — under environmental review
- C/o SWM Plant at Dapo Yarlo, Itanagar — lapsed
- Construction of Solid Waste Management Plant at Karsingsa — initial checks
- Construction of Solid Waste Management Plant at Karsingsa — not approved
All 5 Itanagar Municipal Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.