Quick answers
What is Construction of Solid Waste Management Plant at Karsingsa?
Construction of Solid Waste Management Plant at Karsingsa is a proposed waste management project in Mop Pop, Doimukh Sdo, Papum Pare, Arunachal Pradesh. The site covers 17.3 acres.
Who is building it?
The applicant is Itanagar Municipal Corporation.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Mop Pop, Doimukh Sdo, Papum Pare, Arunachal Pradesh.
How big is it?
It has a stated cost of ₹3.7 crore and a site of 17.3 acres.
When was it filed?
The application was filed on 17 Jun 2024.
Project details
| Status | Initial checks |
|---|---|
| Status since | 17 Jun 2024 |
| Application filed | 17 Jun 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Waste management |
| Applicant | Itanagar Municipal Corporation |
| Land area | 17.3 acres (7 ha) |
| Project cost | ₹3.7 crore |
| Village / locality | Mop Pop |
| Taluk / tehsil | Doimukh Sdo |
| District | Papum Pare |
| State | Arunachal Pradesh |
| Location from | Site area on record |
| Our reference | WID-AR-00287 |
In context
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mop Pop, Doimukh Sdo, Papum Pare, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction of Solid Waste Management Plant at Karsingsa — not approved, 0 m away
- Diversion of 1.65 Ha of Forest Land for Construction of Toll Plaza Ot NH-415… — initial checks, 1.6 km away
- Diversion of 1.65 Ha of Forest Land for Construction of Toll Plaza Ot NH-415… — lapsed, 1.6 km away
- Diversion of 0.0969 ha of forest land for Establishment of Bharat Petroleum… — under wildlife review, 3.8 km away
- Diversion of 0.0969 ha of forest land for Establishment of Bharat Petroleum… — more information requested, 3.8 km away
- Diversion of 0.0041 Ha of Forest Land for Etablishment of Petrol Pump at… — under wildlife review, 3.8 km away
- Diversion of 0.0041 Ha of Forest Land for Etablishment of Petrol Pump at… — forest land use approved, 3.8 km away
- Diversion of 0.0945 ha of forest land for Establishment of Indian Oil… — under wildlife review, 4 km away
More from Itanagar Municipal Corporation in Papum Pare
- 50 TPD Scientific Waste Disposal Facility — under environmental review
- C/o SWM Plant at Dapo Yarlo, Itanagar — initial checks
- C/o SWM Plant at Dapo Yarlo, Itanagar — lapsed
- Construction of Solid Waste Management Plant at Karsingsa — not approved
All 5 Itanagar Municipal Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.