Quick answers
What is this project?
"Solengi River Ordinary Clay/Silt Mining Permit Area, BWTH_PRO_26 (Point 2)" is a lapsed mining project in Badal Pathar, Gohpur, Biswanath, Assam. The site covers 10.4 acres.
Who is building it?
The applicant is SHReejikrupa Project limited.
Has it been approved?
No. The application was lapsed on 28 May 2026, so it is no longer under consideration.
Where is it?
In Badal Pathar, Gohpur, Biswanath, Assam.
How big is it?
It has a stated cost of ₹50 lakh and a site of 10.4 acres.
When was it filed?
The application was filed on 14 Nov 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 28 May 2026 |
| Application filed | 14 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | SHReejikrupa Project limited |
| Land area | 10.4 acres (4.2 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Badal Pathar |
| Taluk / tehsil | Gohpur |
| District | Biswanath |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-01132 |
In context
38 applications in Biswanath since January 2022 are in the same category (Mining): 27 approved, 2 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 10.4 acres, this one is larger than 63% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Badal Pathar, Gohpur, Biswanath, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Solengi River Ordinary Clay/Silt Mining Permit Area, BWTH_PRO_26 (Point 1)" — environmental approval granted, 950 m away
- Wildlife Clearance Proposal for drilling one exploratory location (Loc. OBCA)… — decision issued, 4.4 km away
- Wildlife Clearance Proposal for drilling one exploratory location (Loc. OBCA)… — under wildlife review, 4.4 km away
- Onshore Oil & Gas Exploration Drilling & Testing in OALP Block AA-ONHP-2019/1 — environmental approval granted, 4.4 km away
- Proposed Kanaklata Baruah University at Gohpur Bholaguri, Biswanath, Assam — environmental approval granted, 9.3 km away
- USO Funded 4G Saturation Project — lapsed, 9.8 km away
- 4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15)… — returned to applicant, 18.1 km away
- 4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15)… — cleared for impact study, 18.1 km away
More from SHReejikrupa Project limited in Biswanath
- "Solengi River Ordinary Clay/Silt Mining Permit Area, BWTH_PRO_26 (Point 1)" — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.