Quick answers
What is this project?
"Solengi River Ordinary Clay/Silt Mining Permit Area, BWTH_PRO_26 (Point 1)" is an approved mining project in Daunabari, Gohpur, Biswanath, Assam. The site covers 12.2 acres.
Who is building it?
The applicant is SHReejikrupa Project limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 Apr 2026), as of 27 Nov 2026.
Where is it?
In Daunabari, Gohpur, Biswanath, Assam.
How big is it?
It has a stated cost of ₹50 lakh and a site of 12.2 acres.
When was it filed?
The application was filed on 13 Nov 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Apr 2026 |
| Application filed | 13 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | SHReejikrupa Project limited |
| Land area | 12.2 acres (5 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Daunabari |
| Taluk / tehsil | Gohpur |
| District | Biswanath |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-01473 |
In context
38 applications in Biswanath since January 2022 are in the same category (Mining): 27 approved, 2 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 12.2 acres, this one is larger than 97% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Daunabari, Gohpur, Biswanath, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Solengi River Ordinary Clay/Silt Mining Permit Area, BWTH_PRO_26 (Point 2)" — lapsed, 950 m away
- Wildlife Clearance Proposal for drilling one exploratory location (Loc. OBCA)… — decision issued, 5.1 km away
- Wildlife Clearance Proposal for drilling one exploratory location (Loc. OBCA)… — under wildlife review, 5.1 km away
- Onshore Oil & Gas Exploration Drilling & Testing in OALP Block AA-ONHP-2019/1 — environmental approval granted, 5.1 km away
- USO Funded 4G Saturation Project — lapsed, 9 km away
- Proposed Kanaklata Baruah University at Gohpur Bholaguri, Biswanath, Assam — environmental approval granted, 9.9 km away
- 4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15)… — returned to applicant, 18.8 km away
- 4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15)… — cleared for impact study, 18.8 km away
More from SHReejikrupa Project limited in Biswanath
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.