Quick answers
What is this project?
4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15) and Numaligarh (on NH715) in the State of Assam is a proposed road project in Mazikuchi No2, Gohpur, Biswanath, Assam. The site covers 499.2 acres.
Who is building it?
The applicant is National Highways & Infrastucture Development Corporation Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 7 Apr 2025), as of 27 Nov 2026.
Where is it?
In Mazikuchi No2, Gohpur, Biswanath, Assam.
How big is it?
It has a stated cost of ₹15,303 crore and a site of 499.2 acres.
When was it filed?
The application was filed on 17 Feb 2025.
Project details
| Official title | Proposed Construction of 4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15) and Numaligarh (on NH715) in the State of Assam |
|---|---|
| Status | Cleared for impact study |
| Status since | 7 Apr 2025 |
| Application filed | 17 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Roads & highways |
| Applicant | National Highways & Infrastucture Development Corporation Limited |
| Land area | 499.2 acres (202 ha) |
| Project cost | ₹15,303 crore |
| Village / locality | Mazikuchi No2 |
| Taluk / tehsil | Gohpur |
| District | Biswanath |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-01344 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 17 Feb 2025 (this page) | Cleared for impact study | 499.2 acres | ₹15,303 crore |
| New project filed 14 Feb 2025 | More information requested | 499.2 acres | ₹15,303 crore |
Where it is
Mazikuchi No2, Gohpur, Biswanath, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15)… — returned to applicant, 0 m away
- 4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15)… — more information requested, 0 m away
- 4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15)… — application filed, 0 m away
- "Solengi River Ordinary Clay/Silt Mining Permit Area, BWTH_PRO_26 (Point 2)" — lapsed, 18.1 km away
- "Solengi River Ordinary Clay/Silt Mining Permit Area, BWTH_PRO_26 (Point 1)" — environmental approval granted, 18.8 km away
- Wildlife Clearance Proposal for drilling one exploratory location (Loc. OBCA)… — decision issued, 18.9 km away
- Wildlife Clearance Proposal for drilling one exploratory location (Loc. OBCA)… — under wildlife review, 18.9 km away
- Onshore Oil & Gas Exploration Drilling & Testing in OALP Block AA-ONHP-2019/1 — environmental approval granted, 18.9 km away
More from National Highways & Infrastucture Development Corporation Limited in Biswanath
- 4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15)… — returned to applicant
- 4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15)… — application filed
4 National Highways and Infrastructure Development Corporation (NHIDCL) projects in Biswanath
All 43 National Highways and Infrastructure Development Corporation (NHIDCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.