What is Developing? Open the mapMap

Cleared for impact studyRoads & highways · Biswanath, Assam

4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15) and Numaligarh (on NH715) in the State of Assam

4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15) and Numaligarh (on NH715) in the State of Assam is a proposed road project in Mazikuchi No2, Gohpur, Biswanath, Assam. The site covers 499.2 acres. Its stated project cost is ₹15,303 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 7 Apr 2025).

See it on the live map All projects in Biswanath

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15) and Numaligarh (on NH715) in the State of Assam is a proposed road project in Mazikuchi No2, Gohpur, Biswanath, Assam. The site covers 499.2 acres.

Who is building it?

The applicant is National Highways & Infrastucture Development Corporation Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 7 Apr 2025), as of 27 Nov 2026.

Where is it?

In Mazikuchi No2, Gohpur, Biswanath, Assam.

How big is it?

It has a stated cost of ₹15,303 crore and a site of 499.2 acres.

When was it filed?

The application was filed on 17 Feb 2025.

Project details

Official titleProposed Construction of 4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15) and Numaligarh (on NH715) in the State of Assam
StatusCleared for impact study
Status since7 Apr 2025
Application filed17 Feb 2025
Approval soughtEnvironmental approval
Application typeAmendment
SectorRoads & highways
ApplicantNational Highways & Infrastucture Development Corporation Limited
Land area499.2 acres (202 ha)
Project cost₹15,303 crore
Village / localityMazikuchi No2
Taluk / tehsilGohpur
DistrictBiswanath
StateAssam
Location fromSite boundary on record
Our referenceWID-AS-01344

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 17 Feb 2025 (this page)Cleared for impact study499.2 acres₹15,303 crore
New project filed 14 Feb 2025More information requested499.2 acres₹15,303 crore

Where it is

Mazikuchi No2, Gohpur, Biswanath, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from National Highways & Infrastucture Development Corporation Limited in Biswanath

4 National Highways and Infrastructure Development Corporation (NHIDCL) projects in Biswanath
All 43 National Highways and Infrastructure Development Corporation (NHIDCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.