Quick answers
What is this project?
4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15) and Numaligarh (on NH715) in the State of Assam is a proposed road project in Bar Fallong, Gohpur, Biswanath, Assam. The site covers 499.2 acres.
Who is building it?
The applicant is National Highways & Infrastucture Development Corporation Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Bar Fallong, Gohpur, Biswanath, Assam.
How big is it?
It has a stated cost of ₹15,142 crore and a site of 499.2 acres.
When was it filed?
The application was filed on 8 May 2025.
Project details
| Official title | Proposed Construction of 4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15) and Numaligarh (on NH715) in the State of Assam |
|---|---|
| Status | Returned to applicant |
| Status since | 28 May 2025 |
| Application filed | 8 May 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Roads & highways |
| Applicant | National Highways & Infrastucture Development Corporation Limited |
| Land area | 499.2 acres (202 ha) |
| Project cost | ₹15,142 crore |
| Village / locality | Bar Fallong |
| Taluk / tehsil | Gohpur |
| District | Biswanath |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-01387 |
Where it is
Bar Fallong, Gohpur, Biswanath, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15)… — cleared for impact study, 0 m away
- 4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15)… — more information requested, 0 m away
- 4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15)… — application filed, 0 m away
- "Solengi River Ordinary Clay/Silt Mining Permit Area, BWTH_PRO_26 (Point 2)" — lapsed, 18.1 km away
- "Solengi River Ordinary Clay/Silt Mining Permit Area, BWTH_PRO_26 (Point 1)" — environmental approval granted, 18.8 km away
- Wildlife Clearance Proposal for drilling one exploratory location (Loc. OBCA)… — decision issued, 18.9 km away
- Wildlife Clearance Proposal for drilling one exploratory location (Loc. OBCA)… — under wildlife review, 18.9 km away
- Onshore Oil & Gas Exploration Drilling & Testing in OALP Block AA-ONHP-2019/1 — environmental approval granted, 18.9 km away
More from National Highways & Infrastucture Development Corporation Limited in Biswanath
- 4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15)… — cleared for impact study
- 4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15)… — more information requested
- 4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15)… — application filed
4 National Highways and Infrastructure Development Corporation (NHIDCL) projects in Biswanath
All 43 National Highways and Infrastructure Development Corporation (NHIDCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.