What is Developing? Open the mapMap

Cleared for impact studyMining · Jamui, Bihar

Sand Ghat Mining Project (Ulai River Block No. -01 Sand Ghat) on Ulai River bed

Sand Ghat Mining Project (Ulai River Block No. -01 Sand Ghat) on Ulai River bed is a proposed mining project in Tola Auria, Jhajha, Jamui, Bihar. The site covers 38.3 acres. Its stated project cost is ₹1 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 23 Nov 2023).

See it on the live map All projects in Jamui

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Sand Ghat Mining Project (Ulai River Block No. -01 Sand Ghat) on Ulai River bed is a proposed mining project in Tola Auria, Jhajha, Jamui, Bihar. The site covers 38.3 acres.

Who is building it?

The applicant is Rakesh Kumar Lakhisarai.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 23 Nov 2023), as of 27 Nov 2026.

Where is it?

In Tola Auria, Jhajha, Jamui, Bihar.

How big is it?

It has a stated cost of ₹1 crore and a site of 38.3 acres.

When was it filed?

The application was filed on 23 Nov 2023.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Sand Ghat Mining Project (Ulai River Block No. -01 Sand Ghat) on Ulai River bed

Project details

Official titleSand Ghat Mining Project (Ulai River Block No. -01 Sand Ghat) on Ulai River bed at District- Jamui, Bihar.
StatusCleared for impact study
Status since23 Nov 2023
Application filed23 Nov 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantRakesh Kumar Lakhisarai
Land area38.3 acres (15.5 ha)
Project cost₹1 crore
Village / localityTola Auria
Taluk / tehsilJhajha
DistrictJamui
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00059

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 18 Mar 2024Lapsed38.3 acres₹1 crore
Early planning filed 23 Nov 2023 (this page)Cleared for impact study38.3 acres₹1 crore
New project filed 25 Sept 2023Environmental approval granted38.3 acres₹1 crore

In context

145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 38.3 acres, this one is larger than 68% of them.

No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.

Where it is

Tola Auria, Jhajha, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to Bihar's ₹2,579 Crore Barnar Reservoir Project Advances Towards Implementation After Decades of Delay (8 km away).

Other projects nearby

More from Rakesh Kumar Lakhisarai in Jamui

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.