Quick answers
What is this project?
Sand Ghat Mining Project (Ulai River Block No. -01 Sand Ghat) on Ulai River bed is an approved mining project in Tola Auria, Jhajha, Jamui, Bihar. The site covers 38.3 acres.
Who is building it?
The applicant is Rakesh Kumar Lakhisarai.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Sept 2023), as of 27 Nov 2026.
Where is it?
In Tola Auria, Jhajha, Jamui, Bihar.
How big is it?
It has a stated cost of ₹1 crore and a site of 38.3 acres.
When was it filed?
The application was filed on 25 Sept 2023.
Project details
| Official title | Sand Ghat Mining Project (Ulai River Block No. -01 Sand Ghat) on Ulai River bed at District- Jamui, Bihar. |
|---|---|
| Status | Environmental approval granted |
| Status since | 25 Sept 2023 |
| Application filed | 25 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rakesh Kumar Lakhisarai |
| Land area | 38.3 acres (15.5 ha) |
| Project cost | ₹1 crore |
| Village / locality | Tola Auria |
| Taluk / tehsil | Jhajha |
| District | Jamui |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00064 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 18 Mar 2024 | Lapsed | 38.3 acres | ₹1 crore |
| Early planning filed 23 Nov 2023 | Cleared for impact study | 38.3 acres | ₹1 crore |
| New project filed 25 Sept 2023 (this page) | Environmental approval granted | 38.3 acres | ₹1 crore |
In context
145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 38.3 acres, this one is larger than 68% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Tola Auria, Jhajha, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Bihar's ₹2,579 Crore Barnar Reservoir Project Advances Towards Implementation After Decades of Delay (8 km away).
Other projects nearby
- Sand Ghat Mining Project (Ulai River Block No. -01 Sand Ghat) on Ulai River bed — lapsed, 0 m away
- Sand Ghat Mining Project (Ulai River Block No. -01 Sand Ghat) on Ulai River bed — lapsed, 0 m away
- Sand Ghat Mining Project (Ulai River Block No. -01 Sand Ghat) on Ulai River bed — cleared for impact study, 0 m away
- Sand Ghat Mining Project (Ulai River Block No.- 02) at Riverbed of Ulai River — cleared for impact study, 1.2 km away
- Sand Ghat Mining Project (Ulai River Block No.- 02) at Riverbed of Ulai River — environmental approval granted, 1.2 km away
- Sand Ghat Mining Project (Ulai River Block No. -03) at Riverbed of Ulai River — environmental approval granted, 1.2 km away
- Sand Ghat Mining Project (Ulai River Block No. -03) at Riverbed of Ulai River — cleared for impact study, 1.2 km away
- Transfer of Jamui Sand Ghat Ulai Block 04 Area 5.0 Hect Vill -Tola Satighat,… — environmental approval granted, 2 km away
More from Rakesh Kumar Lakhisarai in Jamui
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.