Quick answers
What is this project?
Sand Ghat Mining Project (Block – 01 Fathepur Sand Ghat) at Riverbed of Bunbuni River is a proposed mining project in Fatehpur, Khaira, Jamui, Bihar. The site covers 23.2 acres.
Who is building it?
The applicant is M/S Ruby Devi.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 24 Jan 2023), as of 27 Nov 2026.
Where is it?
In Fatehpur, Khaira, Jamui, Bihar.
How big is it?
It has a stated cost of ₹74 lakh and a site of 23.2 acres.
When was it filed?
The application was filed on 24 Jan 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand Ghat Mining Project (Block – 01 Fathepur Sand Ghat) at Riverbed of Bunbuni River
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 Jan 2023 |
| Application filed | 24 Jan 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | M/S Ruby Devi |
| Land area | 23.2 acres (9.4 ha) |
| Project cost | ₹74 lakh |
| Village / locality | Fatehpur |
| Taluk / tehsil | Khaira |
| District | Jamui |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00275 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 7 Sept 2023 | Environmental approval granted | 23.2 acres | ₹74 lakh |
| Early planning filed 24 Jan 2023 (this page) | Cleared for impact study | 23.2 acres | ₹74 lakh |
In context
145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 23.2 acres, this one is larger than 52% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Fatehpur, Khaira, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Ghat Mining Project (Block – 01 Fathepur Sand Ghat) at Riverbed of… — environmental approval granted, 0 m away
- Sand Ghat Mining Project (Jamui Kiul Block - 03) at Riverbed of Kiul River — cleared for impact study, 1.7 km away
- Sand Ghat Mining Project (Jamui Kiul Block - 03) at Riverbed of Kiul River — environmental approval granted, 1.7 km away
- Sand Mining Project (Jamui Kiul Block 02 Sand Ghat) at Riverbed of Kiul River — environmental approval granted, 2.2 km away
- Sand Mining Project (Jamui Kiul Block 02 Sand Ghat) at Riverbed of Kiul River — cleared for impact study, 2.2 km away
- Proposed Brick Earth Mining Project of M/s Mata Ita Udyog at Mauza - Badibag,… — environmental approval granted, 2.5 km away
- Bridge at Km 65+750 (From Km 65+430 to Km 66+100) including approach and… — more information requested, 2.7 km away
- Sand Mining Project of Area 14.4 Ha at Sand Block-04 Ghat on Kiul River of… — environmental approval granted, 2.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.