Quick answers
What is this project?
Bridge at Km 65+750 (From Km 65+430 to Km 66+100) including approach and Rehabilitation of existing Bridge at Km 68+520 of Kadirganj-Khaira Road (SH-82) under contract Package No. BSHP-III (Phase-I)/PKG-12, SH-82 is a proposed road project in Gadi Bishunpur, Khaira, Jamui, Bihar. The site covers 0.2 acres.
Who is building it?
The applicant is Bihar State Road Development Corporation Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Gadi Bishunpur, Khaira, Jamui, Bihar.
How big is it?
It has a stated cost of ₹1 lakh; a site of 0.2 acres and 670 m² of forest land.
When was it filed?
The application was filed on 21 Apr 2026.
Project details
| Official title | Construction of Bridge at Km 65+750 (From Km 65+430 to Km 66+100) including approach and Rehabilitation of existing Bridge at Km 68+520 of Kadirganj-Khaira Road (SH-82) under contract Package No. BSHP-III (Phase-I)/PKG-12, SH-82 |
|---|---|
| Status | More information requested |
| Status since | 19 Nov 2026 |
| Application filed | 21 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Bihar State Road Development Corporation Limited |
| Land area | 700 m² |
| Forest land | 670 m² |
| Project cost | ₹1 lakh |
| Village / locality | Gadi Bishunpur |
| Taluk / tehsil | Khaira |
| District | Jamui |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-03602 |
In context
28 applications in Jamui since January 2022 are in the same category (Roads & highways): 0 approved, 26 filed or under review, and 2 withdrawn, lapsed or rejected. At 0.2 acres, this one is smaller than 96% of them.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gadi Bishunpur, Khaira, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Ghat Mining Project (Jamui Kiul Block - 01 Sand Ghat) at Riverbed of Kiul… — cleared for impact study, 800 m away
- Sand Ghat Mining Project (Jamui Kiul Block - 01 Sand Ghat) at Riverbed of Kiul… — environmental approval granted, 850 m away
- Sand Mining Project (Jamui Kiul Block 02 Sand Ghat) at Riverbed of Kiul River — environmental approval granted, 1.3 km away
- Sand Mining Project (Jamui Kiul Block 02 Sand Ghat) at Riverbed of Kiul River — cleared for impact study, 1.3 km away
- Proposed Brick Earth Mining Project of M/s P.R.M. INT UDYOG at Mauza - Harni,… — environmental approval granted, 2.1 km away
- Proposed Brick Earth Mining Project of M/s R.P.M. INT UDYOG at Mauza - Harni,… — environmental approval granted, 2.2 km away
- Sand Ghat Mining Project (Jamui Kiul Block - 03) at Riverbed of Kiul River — cleared for impact study, 2.6 km away
- Sand Ghat Mining Project (Jamui Kiul Block - 03) at Riverbed of Kiul River — environmental approval granted, 2.6 km away
All 34 Bihar State Road Development Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.