Cleared for impact studyMining · Jamui, Bihar

Sand Mining Project (Jamui Kiul Block 02 Sand Ghat) at Riverbed of Kiul River

Sand Mining Project (Jamui Kiul Block 02 Sand Ghat) at Riverbed of Kiul River is a proposed mining project in Gadi Bishunpur, Khaira, Jamui, Bihar. The site covers 24.7 acres. Its stated project cost is ₹1.5 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 22 Oct 2025).

See it on the live map All projects in Jamui

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Sand Mining Project (Jamui Kiul Block 02 Sand Ghat) at Riverbed of Kiul River is a proposed mining project in Gadi Bishunpur, Khaira, Jamui, Bihar. The site covers 24.7 acres.

Who is building it?

The applicant is Amit Coninfra India Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 22 Oct 2025), as of 27 Nov 2026.

Where is it?

In Gadi Bishunpur, Khaira, Jamui, Bihar.

How big is it?

It has a stated cost of ₹1.5 crore and a site of 24.7 acres.

When was it filed?

The application was filed on 20 Aug 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand Mining Project (Jamui Kiul Block 02 Sand Ghat) at Riverbed of Kiul River

Project details

StatusCleared for impact study
Status since22 Oct 2025
Application filed20 Aug 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantAmit Coninfra India Private Limited
Land area24.7 acres (10 ha)
Project cost₹1.5 crore
Village / localityGadi Bishunpur
Taluk / tehsilKhaira
DistrictJamui
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-01013

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 27 Jan 2026Environmental approval granted24.7 acres₹1.5 crore
Early planning filed 20 Aug 2025 (this page)Cleared for impact study24.7 acres₹1.5 crore

In context

145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 24.7 acres, this one is larger than 57% of them.

No other mining lease on record is within 500 m of this site; 9 have applied within 5 km.

Where it is

Gadi Bishunpur, Khaira, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.