Proposed Sand Mining Project of Area 33.0 Ha at BHOJ SON- 30C on Sone River of District- Bhojpur, State- Bihar.

Proposed Sand Mining Project of Area 33.0 Ha at BHOJ SON- 30C on Sone River of District- Bhojpur, State- Bihar is a proposed mining project in Peur Chak, Sahar, Bhojpur, Bihar. The site covers 81.5 acres. Its stated project cost is ₹10.1 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 24 May 2024).

See it on the live map All projects in Bhojpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand Mining Project of Area 33.0 Ha at BHOJ SON- 30C on Sone River of District- Bhojpur, State- Bihar is a proposed mining project in Peur Chak, Sahar, Bhojpur, Bihar. The site covers 81.5 acres.

Who is building it?

The applicant is Geeta Sarswat.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 24 May 2024), as of 27 Nov 2026.

Where is it?

In Peur Chak, Sahar, Bhojpur, Bihar.

How big is it?

It has a stated cost of ₹10.1 crore and a site of 81.5 acres.

When was it filed?

The application was filed on 17 May 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand Mining Project of Area 33.0 Ha at BHOJ SON- 30C on Sone River of District-…

Project details

StatusCleared for impact study
Status since24 May 2024
Application filed17 May 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantGeeta Sarswat
Land area81.5 acres (33 ha)
Project cost₹10.1 crore
Village / localityPeur Chak
Taluk / tehsilSahar
DistrictBhojpur
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00564

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 17 Mar 2025Environmental approval granted81.5 acres₹10.1 crore
Early planning filed 17 May 2024 (this page)Cleared for impact study81.5 acres₹10.1 crore

In context

142 applications in Bhojpur since January 2022 are in the same category (Mining): 133 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 28 days from filing to approval. At 81.5 acres, this one is larger than 55% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 244.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 16 mining leases have applied within 5 km.

Where it is

Peur Chak, Sahar, Bhojpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.