Quick answers
What is this project?
Sand Ghat Mining Project (Jamui Kiul Block - 01 Sand Ghat) at Riverbed of Kiul River is an approved mining project in Gadi Bishunpur, Khaira, Jamui, Bihar. The site covers 61.8 acres.
Who is building it?
The applicant is M/S Ravi Shankar Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 Aug 2024), as of 27 Nov 2026.
Where is it?
In Gadi Bishunpur, Khaira, Jamui, Bihar.
How big is it?
It has a stated cost of ₹2.9 crore and a site of 61.8 acres.
When was it filed?
The application was filed on 22 Jul 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Aug 2024 |
| Application filed | 22 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | M/S Ravi Shankar Kumar |
| Land area | 61.8 acres (25 ha) |
| Project cost | ₹2.9 crore |
| Village / locality | Gadi Bishunpur |
| Taluk / tehsil | Khaira |
| District | Jamui |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00720 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 22 Jul 2024 (this page) | Environmental approval granted | 61.8 acres | ₹2.9 crore |
| Early planning filed 3 Jun 2024 | Cleared for impact study | 61.8 acres | ₹2.9 crore |
In context
145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 61.8 acres, this one is larger than 77% of them.
No other mining lease on record is within 500 m of this site; 8 have applied within 5 km.
Where it is
Gadi Bishunpur, Khaira, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Ghat Mining Project (Jamui Kiul Block - 01 Sand Ghat) at Riverbed of Kiul… — cleared for impact study, 50 m away
- Bridge at Km 65+750 (From Km 65+430 to Km 66+100) including approach and… — more information requested, 850 m away
- Proposed Brick Earth Mining Project of M/s P.R.M. INT UDYOG at Mauza - Harni,… — environmental approval granted, 1.3 km away
- Proposed Brick Earth Mining Project of M/s R.P.M. INT UDYOG at Mauza - Harni,… — environmental approval granted, 1.5 km away
- Sand Mining Project (Jamui Kiul Block 02 Sand Ghat) at Riverbed of Kiul River — environmental approval granted, 1.8 km away
- Sand Mining Project (Jamui Kiul Block 02 Sand Ghat) at Riverbed of Kiul River — cleared for impact study, 1.8 km away
- Brick Earth Mining project of M/s D.R.S. Int Udyog at Mauza- Harni, Block-… — initial checks, 3 km away
- Sand Ghat Mining Project (Jamui Kiul Block - 03) at Riverbed of Kiul River — cleared for impact study, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.