Quick answers
What is this project?
Proposed Sand Mining Project of Area 29.5 Ha at Aurangabad Sone-12-C Sand Ghat on Sone River of District-Aurangabad State-Bihar is a proposed mining project in Dihra, Obra, Aurangabad, Bihar. The site covers 72.9 acres.
Who is building it?
The applicant is Harshit jindal.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 14 Aug 2025), as of 27 Nov 2026.
Where is it?
In Dihra, Obra, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹8.8 crore and a site of 72.9 acres.
When was it filed?
The application was filed on 13 Jun 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand Mining Project of Area 29.5 Ha at Aurangabad Sone-12-C Sand Ghat on Sone…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 14 Aug 2025 |
| Application filed | 13 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Harshit jindal |
| Land area | 72.9 acres (29.5 ha) |
| Project cost | ₹8.8 crore |
| Village / locality | Dihra |
| Taluk / tehsil | Obra |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01138 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Apr 2026 | Environmental approval granted | 72.9 acres | ₹8.8 crore |
| Early planning filed 13 Jun 2025 (this page) | Cleared for impact study | 72.9 acres | ₹8.8 crore |
In context
145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 72.9 acres, this one is larger than 50% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 228.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 24 mining leases have applied within 5 km.
Where it is
Dihra, Obra, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project of Area 29.5 Ha at Aurangabad Sone-12-C Sand Ghat… — environmental approval granted, 0 m away
- Sand Mining Project at Sand Block No.- 13A Sand Ghat on Son river at Mauza-… — environmental approval granted, 300 m away
- Sand Mining Project at Sand Block No.- 13A Sand Ghat on Son river at Mauza-… — cleared for impact study, 300 m away
- Proposed Sand Mining Project of Area 33.0 Ha at Aurangabad Sone- 12-B on Sone… — cleared for impact study, 300 m away
- Project: Aurangabad Son 13 - B Sand Ghat, (Area- 26.0 Ha) Production-498600… — environmental approval granted, 550 m away
- Project: Aurangabad Son 13 - B Sand Ghat, (Area- 26.0 Ha) Production-498600… — cleared for impact study, 550 m away
- Proposed Sand Mining Project Aurangabad Sandghat/ Block No.- 12A Sand Ghat on… — cleared for impact study, 700 m away
- Sand Mining Project, Aurangabad Son 13-C Sand Ghat of District- Aurangabad,… — environmental approval granted, 850 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.