What is Developing? Open the mapMap

Cleared for impact studyMining · Aurangabad, Bihar

Proposed Sand Mining Project of Area 29.5 Ha at Aurangabad Sone-12-C Sand Ghat on Sone River of District-Aurangabad State-Bihar

Proposed Sand Mining Project of Area 29.5 Ha at Aurangabad Sone-12-C Sand Ghat on Sone River of District-Aurangabad State-Bihar is a proposed mining project in Dihra, Obra, Aurangabad, Bihar. The site covers 72.9 acres. Its stated project cost is ₹8.8 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 14 Aug 2025).

See it on the live map All projects in Aurangabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand Mining Project of Area 29.5 Ha at Aurangabad Sone-12-C Sand Ghat on Sone River of District-Aurangabad State-Bihar is a proposed mining project in Dihra, Obra, Aurangabad, Bihar. The site covers 72.9 acres.

Who is building it?

The applicant is Harshit jindal.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 14 Aug 2025), as of 27 Nov 2026.

Where is it?

In Dihra, Obra, Aurangabad, Bihar.

How big is it?

It has a stated cost of ₹8.8 crore and a site of 72.9 acres.

When was it filed?

The application was filed on 13 Jun 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand Mining Project of Area 29.5 Ha at Aurangabad Sone-12-C Sand Ghat on Sone…

Project details

StatusCleared for impact study
Status since14 Aug 2025
Application filed13 Jun 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantHarshit jindal
Land area72.9 acres (29.5 ha)
Project cost₹8.8 crore
Village / localityDihra
Taluk / tehsilObra
DistrictAurangabad
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-01138

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 17 Apr 2026Environmental approval granted72.9 acres₹8.8 crore
Early planning filed 13 Jun 2025 (this page)Cleared for impact study72.9 acres₹8.8 crore

In context

145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 72.9 acres, this one is larger than 50% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 228.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 24 mining leases have applied within 5 km.

Where it is

Dihra, Obra, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.