What is Developing? Open the mapMap

Cleared for impact studyMining · Aurangabad, Bihar

Proposed Sand Mining Project of Area 33.0 Ha at Aurangabad Sone- 12-B on Sone River of District- Aurangabad, State- Bihar

Proposed Sand Mining Project of Area 33.0 Ha at Aurangabad Sone- 12-B on Sone River of District- Aurangabad, State- Bihar is a proposed mining project in Dihra, Obra, Aurangabad, Bihar. The site covers 81.5 acres. Its stated project cost is ₹10.1 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 18 Oct 2025).

See it on the live map All projects in Aurangabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand Mining Project of Area 33.0 Ha at Aurangabad Sone- 12-B on Sone River of District- Aurangabad, State- Bihar is a proposed mining project in Dihra, Obra, Aurangabad, Bihar. The site covers 81.5 acres.

Who is building it?

The applicant is Ananya Engicon Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 18 Oct 2025), as of 27 Nov 2026.

Where is it?

In Dihra, Obra, Aurangabad, Bihar.

How big is it?

It has a stated cost of ₹10.1 crore and a site of 81.5 acres.

When was it filed?

The application was filed on 9 Sept 2025.

Project details

StatusCleared for impact study
Status since18 Oct 2025
Application filed9 Sept 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantAnanya Engicon Private Limited
Land area81.5 acres (33 ha)
Project cost₹10.1 crore
Village / localityDihra
Taluk / tehsilObra
DistrictAurangabad
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-01128

In context

145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 81.5 acres, this one is larger than 74% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 240.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 23 mining leases have applied within 5 km.

Where it is

Dihra, Obra, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.