Quick answers
What is this project?
Proposed Sand Mining Project of Area 29.5 Ha at Aurangabad Sone-12-C Sand Ghat on Sone River of District-Aurangabad State-Bihar is an approved mining project in Dihra, Obra, Aurangabad, Bihar. The site covers 72.9 acres.
Who is building it?
The applicant is Harshit jindal.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 24 Jun 2026), as of 27 Nov 2026.
Where is it?
In Dihra, Obra, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹8.8 crore and a site of 72.9 acres.
When was it filed?
The application was filed on 17 Apr 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 24 Jun 2026 |
| Application filed | 17 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Harshit jindal |
| Land area | 72.9 acres (29.5 ha) |
| Project cost | ₹8.8 crore |
| Village / locality | Dihra |
| Taluk / tehsil | Obra |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02068 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Apr 2026 (this page) | Environmental approval granted | 72.9 acres | ₹8.8 crore |
| Early planning filed 13 Jun 2025 | Cleared for impact study | 72.9 acres | ₹8.8 crore |
In context
145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 72.9 acres, this one is larger than 50% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 228.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 24 mining leases have applied within 5 km.
Where it is
Dihra, Obra, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project of Area 29.5 Ha at Aurangabad Sone-12-C Sand Ghat… — cleared for impact study, 0 m away
- Sand Mining Project at Sand Block No.- 13A Sand Ghat on Son river at Mauza-… — environmental approval granted, 300 m away
- Sand Mining Project at Sand Block No.- 13A Sand Ghat on Son river at Mauza-… — cleared for impact study, 300 m away
- Proposed Sand Mining Project of Area 33.0 Ha at Aurangabad Sone- 12-B on Sone… — cleared for impact study, 300 m away
- Project: Aurangabad Son 13 - B Sand Ghat, (Area- 26.0 Ha) Production-498600… — environmental approval granted, 550 m away
- Project: Aurangabad Son 13 - B Sand Ghat, (Area- 26.0 Ha) Production-498600… — cleared for impact study, 550 m away
- Proposed Sand Mining Project Aurangabad Sandghat/ Block No.- 12A Sand Ghat on… — cleared for impact study, 700 m away
- Sand Mining Project, Aurangabad Son 13-C Sand Ghat of District- Aurangabad,… — environmental approval granted, 850 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.