Quick answers
What is this project?
Project: Aurangabad Son 13 - B Sand Ghat, (Area- 26.0 Ha) Production-498600 CUM or 837648 Tonnes/ Annum Settlee: M/s Maa Laxmi Transport Co., Director- Ajay Kumar, Chunchun Kumar is a proposed mining project in Dihra, Obra, Aurangabad, Bihar. The site covers 64.2 acres.
Who is building it?
The applicant is Maa Laxmi Transport Co.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 24 Apr 2026), as of 27 Nov 2026.
Where is it?
In Dihra, Obra, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹7.9 crore and a site of 64.2 acres.
When was it filed?
The application was filed on 9 Mar 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Project: Aurangabad Son 13 - B Sand Ghat, (Area- 26.0 Ha) Production-498600 CUM or…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 Apr 2026 |
| Application filed | 9 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Maa Laxmi Transport Co |
| Land area | 64.2 acres (26 ha) |
| Project cost | ₹7.9 crore |
| Village / locality | Dihra |
| Taluk / tehsil | Obra |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02835 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 28 Apr 2026 | Environmental approval granted | 64.2 acres | ₹7.9 crore |
| Early planning filed 9 Mar 2026 (this page) | Cleared for impact study | 64.2 acres | ₹7.9 crore |
In context
145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 64.2 acres, this one is smaller than 59% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 206.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 26 mining leases have applied within 5 km.
Where it is
Dihra, Obra, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project: Aurangabad Son 13 - B Sand Ghat, (Area- 26.0 Ha) Production-498600… — environmental approval granted, 0 m away
- Sand Mining Project, Aurangabad Son 13-C Sand Ghat of District- Aurangabad,… — environmental approval granted, 250 m away
- Sand Mining Project, Aurangabad Son 13-C Sand Ghat of District- Aurangabad,… — cleared for impact study, 250 m away
- Sand Mining Project at Sand Block No.- 13A Sand Ghat on Son river at Mauza-… — environmental approval granted, 250 m away
- Sand Mining Project at Sand Block No.- 13A Sand Ghat on Son river at Mauza-… — cleared for impact study, 250 m away
- Proposed Sand Mining Project of Area 29.5 Ha at Aurangabad Sone-12-C Sand Ghat… — environmental approval granted, 550 m away
- Proposed Sand Mining Project of Area 29.5 Ha at Aurangabad Sone-12-C Sand Ghat… — cleared for impact study, 550 m away
- Sand Mining Project at Sand Block No. - 14A Sand Ghat located at Mouza -… — environmental approval granted, 550 m away
More from Maa Laxmi Transport Co in Aurangabad
- Aurangabad Block 32 (Aurangabad MoEF Son 1F) Sand Ghat at Mauja– Mahuaon P.O +… — cleared for impact study
All 3 Maa Laxmi Transport Co projects across India